Chargalytics is a market intelligence platform for the EV charging industry. We collect and process data from charging networks across 37 countries, covering 524,000+ charging stations, 1,578,000+ charging bays and 1,673,000+ connectors. Realtime status is available in 26 of those markets.

We turn that data into analytics, benchmarks, forecasts, and tools that help operators, investors, consultants, and anyone building charging infrastructure make better decisions.

Owners & Investors use it to track M&A activity, evaluate operator performance, model returns on new sites, and understand market dynamics before committing capital.

Charge Point Operators use it to benchmark against competitors, monitor network health, plan new locations, and manage the full project lifecycle from site selection to commissioning.

Analysts use it for country-level market analytics, EV adoption tracking, FC usage trends, and demand forecasting across 37 markets.

Consultants use it to deliver data-backed recommendations to their clients, with exportable analytics and financial models they can put into pitch decks.

Regulators use it to assess infrastructure adequacy, monitor compliance, and understand how policy translates into actual deployment and utilisation on the ground.

OEMs use it to understand where charging infrastructure exists (and where it doesn't), which hardware is deployed at scale, and how charging patterns affect vehicle design and sales strategy.

We integrate with national access points (NAPs), government registries, OCPI feeds, DATEX II endpoints, and operator APIs across Europe and beyond. Key sources include NOBIL (Nordics), Mobilithek (Germany), AFIR feeds (Finland, Lithuania), and dozens of country-specific registries.

Realtime status data is ingested continuously from WebSocket, MQTT, and polling sources. We process hundreds of thousands of status events per day across 26 countries with live monitoring.

All data is normalised into a unified schema: same fields, same connector types, same status codes regardless of the source country.

Currently 37 countries with station data: Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czechia, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Liechtenstein, Lithuania, Luxembourg, Mauritius, Mexico, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, United Kingdom and United States.

Realtime charging status data is available in 26 of these markets, where operator APIs provide live connector information. Coverage is expanding every month.

Our insights articles are freely accessible without an account.

Everything else requires an active subscription: the interactive map, country analytics, CPO benchmark, ChargiPedia, news archive, newsletter, and forum.

The Projects tool (location planning, site design, BOM, financial modelling) requires the Premium tier.

Every new account starts with a 7-day free trial of the full platform — no card required — so you can explore everything before committing.

Your 7-day free trial (no card required) covers the whole platform. After that, two tiers:

Plan Every 30 days Annual (11 × the 30-day price) Includes
Analytics €24.99 €274.89/yr Map, countries, CPO benchmark, newsletter, forum
Analytics + Projects €99.00 €1,089.00/yr Everything in Analytics, plus the full Projects tool

Business teams pay the same price per seat. A year costs 11 times the 30-day price on both tiers.

These are early-adopter prices. Subscribe while they apply and you keep yours until 31 December 2027; cancel and return later, and you pay the price of the day.

These four words get used interchangeably across the industry, which makes network sizes impossible to compare. We use them precisely, and always in the same way:

  • Station — one physical location with charging. A forecourt with twelve stalls is one station. We track 524,000+.
  • Charger — one physical hardware box. A single box often serves more than one car.
  • Connector — one physical outlet, i.e. one plug on a cable. We track 1,673,000+.
  • Bay — the ability to charge one car at a time. A charger with a CCS and a CHAdeMO plug that can only serve one car at once is one bay with two connectors. We track 1,578,000+.

Bays are the number that matters for utilisation — they measure how many cars can actually charge simultaneously, so every usage metric on the platform (minutes per bay per day, sessions per bay per day, kWh per bay per day) is expressed per bay. Connector counts are larger and more flattering; we report them, but we don’t benchmark on them.

You may also see EVSE in the wider industry. It means the same thing as our bay. We avoid the term because it is routinely used to mean “charger” as well, which is what causes the confusion in the first place.

Analytics

The analytics suite includes three tools: the interactive map, country analytics, and CPO benchmark. All require an active subscription.

Interactive map

Interactive map showing charging stations across Northern Europe

The map displays every charging station in our database, clustered at lower zoom levels and showing individual stations as you zoom in. At a glance you see the density of charging infrastructure across a country or region.

Click on any station to open a detail panel showing the operator, connector types, power levels, address, and historical usage statistics where available.

Layers let you toggle different data overlays on the map. Open the Layers panel in the top toolbar to switch between the charging station layer, POI heatmaps, and other data visualisations.

The charging density legend in the bottom-left corner shows you the colour scale from sparse to dense coverage.

Yes. Click Map type in the toolbar to switch between roadmap, terrain, satellite, and hybrid views. Use Locate me to centre the map on your current position.

Station detail panel showing realtime connector status, performance snapshot, and nearby station comparison

Clicking any station opens a detail panel with live data. The Data tab shows:

  • Performance snapshot — a composite health score (0–100), average FC load, and sessions per bay per day
  • Realtime overview — current status of every connector (available, charging, unknown), updated continuously
  • Nearby stations — a comparison chart showing fast-charging minutes per day at this station vs. nearby competitors over the last 7 days
  • Usage history — weekly and monthly fast-charging volume and sessions over the full observation window

Stations with realtime data show live connector bars; those without show the latest known static metadata.

Station forecast tab showing location score, CPO execution score, and backtest chart

The Forecast tab shows how our model evaluates the station:

  • Location score — how the site's inherent value compares to the market median (a gauge showing above or below average)
  • CPO execution score — how well the operator performs relative to what the location should deliver, with a confidence indicator
  • Backtest chart — model predictions (orange) vs. actual observed usage (teal) over the training window, so you can see exactly how well the model fits this station
  • 12-month prognosis — forward-looking demand predictions accounting for seasonal patterns, temperature, and EV adoption trends

Country analytics

Country analytics overview with BEV adoption map and country selector

Country analytics gives you a deep look into EV charging infrastructure and adoption at the national level. Select any country from the dropdown (or click one on the map) and you get KPIs, trend charts, operator breakdowns, pricing data, usage metrics, and market outlook — all on a single, scrollable page.

The page is organised into sections: EV Adoption, Charging Infrastructure, Ad-Hoc Pricing, Fast-Charging Usage, FC Market Outlook, Regulation, and Country News. Each section is covered in detail below.

Use the country selector dropdown at the top right of the page. It shows the country name and station count. After selecting, click Refresh to load the new data. You can also click directly on countries in the adoption map.

EV Adoption section showing BEV market share KPI, S-curve forecast, and fleet stock chart

The EV Adoption section tracks how battery-electric vehicles are penetrating each market. It includes:

  • BEV market share KPI — the current percentage of new car sales that are battery-electric, front and centre
  • S-curve forecast — a logistic growth model projecting BEV market share years into the future. Each country is assigned a tier based on where it sits on the adoption curve: Early (below ~5%), Growth (5–25%), Mainstream (25–60%), and Saturation (above 60%). The tier determines the shape and pace of the forecast
  • BEV fleet stock chart — cumulative BEVs on the road over time, showing historical actuals and projected growth
  • Data table — a year-by-year breakdown of BEV registrations, fleet stock, market share, and growth rate for each country

Charging Infrastructure section with 6 KPIs and top operators table

A snapshot of the country's physical charging network. Six KPI cards show:

  • Stations — all public charging locations
  • Bays — how many cars can charge at once
  • DC Fast — CCS, CHAdeMO, and NACS bays
  • AC — Type 2 and Type 1 bays
  • Operators — number of distinct CPOs active in the country
  • Avg FC Power — average rated power of DC fast bays in kW

Below the KPIs, a top operators table ranks the largest CPOs by network size. Each row shows the operator's station count, bay count, DC share, location score (median site quality from Pulse), and execution score (how well they perform relative to their sites' potential).

Ad-Hoc Pricing section with DC/AC toggle, average and range bars by connector type

Pricing analytics for public charging in the selected country. Toggle between DC (fast charging) and AC (destination charging) to compare tariffs.

For each view you see the national average, minimum, and maximum per-kWh price, plus how many CPOs reported pricing data. Bar charts break down pricing by connector type (CCS, CHAdeMO, Type 2, etc.), showing average and range for each.

All prices are in EUR per kWh, excluding VAT, based on ad-hoc (pay-as-you-go) tariffs — no subscription or membership discounts included.

Fast-Charging Usage section with KPIs, monthly trend, MoM comparison, and CPO breakdown

The heart of the analytics page for countries with realtime data. This section shows how heavily the fast-charging network is actually being used. Available only for the 26 countries where we have live status monitoring.

Top-level KPI cards include:

  • FC Bays and FC Sites — monitored fast-charging infrastructure
  • Minutes per bay per day — average daily usage intensity
  • Sessions per bay per day — average daily session count per bay
  • Avg session duration — mean charging session length
  • Build rate — net new DC bays added per month

Charts below the KPIs include:

  • Realtime status — current aggregate status (charging, available, offline) across all monitored bays
  • Monthly trend — FC minutes per bay per day over time, showing seasonality and growth
  • Month-over-month comparison — this month vs. last month, highlighting the delta
  • Volume by CPO — stacked chart showing which operators account for the most FC minutes
  • Market share trend — how each CPO's share of total FC volume evolves over time
  • Build rate by CPO — which operators are adding the most new bays

FC Market Outlook section with utilization gauge, demand metrics, and projection charts

An embedded version of our full FC Market Outlook model (see the dedicated FC Market Outlook section below for methodology). Within the country page you see:

  • Utilization gauge — current national FC utilization as a dial, showing where the market sits between underserved and overbuilt
  • Demand metrics — sessions per BEV per year, FC hours per BEV per year, bays per 1K BEVs, and whether these are measured or estimated
  • Model parameters — the economic assumptions driving the projection (CAPEX/bay, operating margin, target IRR, FC price/kWh)
  • Four charts — projected FC bays vs. equilibrium, BEV fleet growth, kWh throughput per bay per day, and utilization percentage over the projection horizon

Regulation section showing country-specific laws, directives, and incentives

The Regulation section is loaded dynamically from ChargiPedia. It shows all laws, EU directives, national incentive programmes, and standards that apply to EV charging in the selected country. Each entry explains what the regulation requires, who it affects, and when it takes effect.

This connects directly to the full ChargiPedia regulations database, filtered to the country you're viewing.

At the bottom of each country page, a news feed shows recent articles from our news archive filtered to the selected country. Articles are AI-tagged by topic and mentioned companies, so you see exactly what's happening in that market without having to search manually.

Demand pressure measures how intensively a country's fast-charging infrastructure is being used relative to its BEV fleet. It combines realtime charging data with EV adoption statistics to produce a single utilization metric.

We continuously monitor the status of every fast-charging connector (CCS, CHAdeMO, NACS / Tesla) across all countries where we have realtime data. Every status transition (Available → Charging → Available) is recorded, rolled up hourly, then aggregated monthly. From these rollups we derive:

  • Sessions per BEV per year — how often, on average, each BEV in the country uses a public fast charger
  • FC hours per BEV per year — total fast-charging time divided by the BEV fleet
  • Utilization % — what fraction of total available bay-hours are spent charging, calculated only from bays with realtime monitoring
  • Bays per 1K BEV — infrastructure provisioning ratio

Countries where we have at least 2 months of realtime connector status data are labeled measured. Utilization is calculated only from the subset of FC bays we actively monitor — the RT coverage percentage tells you how representative the sample is.

For countries without RT data, we assign a demand archetype based on geography and driving patterns (e.g. large highway country, compact dense country, island). The archetype's parameters are calibrated from our measured baselines.

  • Below 5% — Low usage. The network has significant spare capacity.
  • 5–10% — Comfortable. Healthy balance between supply and demand.
  • 10–20% — Moderate pressure. Peak-hour queuing may occur at popular locations.
  • Above 20% — High pressure. Systematic capacity shortages likely. New infrastructure urgently needed.

These thresholds are based on 24/7 average utilization. A 10% national average typically means 25–35% during peak hours at busy stations.

CPO benchmark

CPO benchmark overview with KPI strip and operator leaderboard

The CPO benchmark ranks charge point operators by performance within a country. It answers the question every operator wants answered: how do I compare?

Top-level KPI cards show the number of Active CPOs in the market, Total Active FC Bays, Average minutes per bay per day (the national usage intensity), and Fleet Availability (what percentage of bays are in an available state right now). These give you the market context before diving into individual operators.

The leaderboard is a ranked list of every CPO active in the selected country. Each operator card shows at a glance:

  • Sites / Bays — network size
  • Sess/bay/day — average charging sessions per bay per day (utilisation proxy)
  • Available % — percentage of bays in an available state (uptime)
  • Bays (3M) — net bay additions in the last 3 months (growth)
  • Bays/site — average bays per site (density)
  • Score — composite score combining utilisation, availability, growth, and scale
  • Min/bay/day — average minutes of charging per bay per day

The pill buttons above the leaderboard let you re-rank operators by nine different criteria:

  • Minutes per bay — charging minutes per bay per day (how long the plugs are in use)
  • Sessions per bay — charging sessions per bay per day, each counted when charging starts (how often the plugs are used)
  • Volume — total FC minutes across the entire network (absolute market share)
  • Network Size — total active bays (scale)
  • Growth — net bays added in the last 3 months (build momentum)
  • Availability — percentage of bays available (operational quality)
  • Location Score — median Pulse location score across all the operator's sites (portfolio quality)
  • Exec Score — median CPO execution score (operational outperformance vs. site potential)
  • Price — ad-hoc per-kWh tariff (for operators that publish pricing)

Each sort mode reshuffles the leaderboard so the top-ranked operator for that metric appears first. Fast charging opens on minutes per bay, Type 2 on sessions per bay; picking the other one makes it the headline figure on every card.

The toggle switches the entire benchmark between Fast Charging (DC networks: CCS, CHAdeMO, NACS) and Type 2 (AC destination charging). The two segments have completely different economics, operators, and usage patterns, so they're benchmarked separately.

Most users will focus on FC, but the Type 2 view is useful for understanding destination charging coverage, especially in markets where AC still dominates public infrastructure.

Type 2 is ranked by sessions per bay per day rather than minutes: a car left on an AC post for several days is one session but thousands of minutes. Many AC operators connect only part of their network to live status, so a card shows how many of the operator's sites and plugs on the map report it, e.g. “50 / 120 bays”. All usage figures cover only the reporting part.

CPO benchmark deep dive charts showing sessions ranking, market share, volume trend, pricing, and growth leaders

Click an operator in the leaderboard (or the Deep Dive button) to access detailed comparative charts:

  • Sessions per Bay ranking — bar chart comparing all operators by utilisation intensity
  • Market Share + Fleet Availability — dual-axis chart showing each operator's share of total FC volume alongside their uptime
  • Volume Trend — monthly FC minutes for the selected operator over time, with seasonality visible
  • kWh Pricing — how the operator's ad-hoc tariff compares to the national average and competitors
  • Growth Leaders — which operators are adding the most bays, with trailing 3-month and 12-month net additions

Pulse

Pulse is our proprietary demand intelligence engine. It turns millions of realtime charging observations into location scores, demand forecasts, and financial projections — for any point on the map, in any market we cover. Here’s how it works — and why it keeps getting better.

Point at any spot on a map and Pulse will tell you how much fast-charging demand it would see. Not a vague “good” or “bad” — an actual number: estimated charging minutes per bay per day, broken down by month and explainable down to the individual input features that drove the result.

The model works in three stages that multiply together, plus two adjustments for stations that already exist.

Stage 1 — Demand base

The demand base is a table: for every trained market and every calendar month it holds the usage of the typical station — the median training station of that market — in charging minutes per bay per day. It is estimated within stations, so stations opening and closing during the year cannot move it; only real changes in how much the same stations are used can. Two things are read straight off the table:

  • Market level — driving culture, highway density and charging habits differ structurally between countries. Over a year the typical Norwegian station does about 108 minutes per bay per day, the typical German one 95, Swedish 67 and Slovak 37. The table carries those differences as measured, not as assumptions.
  • Season — fast charging in our markets has two peaks a year, not one: a winter peak when cold weather cuts range, and a summer peak when people drive to holiday. For Norway the table runs from about 134 minutes per bay per day in January down to about 96 in May, back up to about 130 in July, and down again in the autumn.

For months beyond the observed table (every forecast month), the market keeps its own level and its own calendar shape. Markets where we do not yet have enough clean observation get the pooled level and shape of the trained markets, and every forecast for them is flagged as uncalibrated. We would rather tell you that than pretend the Netherlands is Denmark.

The trained markets are currently Norway, Sweden, Denmark, Finland, Germany, France, Switzerland and Slovakia. “Clean” is a rule, not a judgement call: a station-month enters training only if we observed the station for at least 90% of that month and at least half of its bays were reporting. Partly observed months used to be read as low usage, and they were quietly pulling the model down. Stations that have gone silent or stopped reporting are excluded from training too — the model describes a working station.

The demand base answers: what does “normal” look like in this country, this month? The output is typically between 35 and 145 minutes per bay per day, depending on market and season.

Stage 2 — Location score

The demand base tells you about the market. The location score tells you about this specific spot. It is a machine learning model (gradient-boosted trees) that evaluates 61 features in five groups:

  • Traffic — composite traffic score derived from government AADT (annual average daily traffic) data, weighted by road proximity and type, plus highway traffic percentage and max road AADT.
  • Competition — existing DC fast-charge bays within 5 km, 10 km and 25 km, and distance to the nearest competitor. More competition means each station captures a smaller share of passing demand.
  • Points of interest — fuel stations, food, parking and other amenities within 1 km and 5 km, including malls, brand fast food, chain stores and retail density: proxies for footfall and dwell time.
  • Venue — what is within 150 metres of the bays: a supermarket, a mall, a fast-food restaurant, a hotel, a fuel station, a big-box store, a rest area; brand names found in the station’s name and the names of its neighbours; whether it is open 24 hours, charges for parking, is roofed, or has truck (MCS) bays. This is the difference between “near a shopping street” and “in the supermarket car park”.
  • The station and its neighbours — the number of fast bays and the maximum charger power, and how the nearest stations we observe actually perform: the usage of the ten closest training stations, weighted by distance, and the average within 10 and 30 km. Real neighbours are the strongest single signal in the model.

In the current model the strongest signals are, in order: the usage of the nearest observed stations, maximum charger power, distance to the nearest food outlet, food outlets within 1 km, neighbour usage within 30 km and the traffic score.

The model is trained on 97,366 clean station-months of observed charging usage across 21,322 live stations in the eight trained markets, August 2025 to August 2026. It learns which combination of features predicts high or low utilisation relative to the typical station of the same market — then applies that to any point. The score is centred per market: the median training station in each country scores 1.0, a 2.0 does twice what the typical station of that market does, a 0.5 half. There is no geography term in this layer; we tested one and it added nothing beyond noise.

The output is a single number: the location score. It acts as a multiplier on the demand base.

Stage 3 — Operator adjustment

The location score is deliberately operator-blind — it measures the land, not who’s standing on it. When producing a demand forecast for a specific project, a third factor enters: the CPO execution factor, estimated per operator and per country from the same station-months. It adjusts for how well a given operator converts location potential into actual sessions (see “What is the CPO execution score?” below). The default is 1.0, meaning plan-case execution.

Two adjustments for existing stations

Site seasonality. In Norway and Denmark, where we have the longest clean history, each site also gets its own seasonal profile predicted from the same features: a hotel or leisure site runs summer-heavy, a commuter site winter-heavy. The effect is a multiplier by month, typically between 0.8 and 1.2, and 1.0 everywhere else until those markets have a full year of clean data.

The station’s own history. For a station we have observed, the forecast blends the model with the station’s actual track record: the longer the history, the more it counts. The backtest you see on a station page is always the pure model, so you can judge it; the prognosis is the model corrected by what the station has actually done.

The multiplication chain

The final demand estimate is simply:

minutes / bay / day  =  demand base  ×  location score  ×  CPO factor  ×  site season

A worked example: a site in Oslo, January 2027, with a location score of 1.5, plan-case execution and a neutral seasonal profile:

Demand base (Norway, January)134 min/bay/day
Location score× 1.50
CPO execution factor× 1.00
Site season× 1.00
Predicted demand201 min/bay/day

The same location in May has a demand base of about 96, giving 144 min/bay/day — the spring trough. In July the holiday peak lifts the base back to about 130, giving 195. The old assumption that summer is simply the quiet season is what the data disproved.

Why scores differ across markets

They mostly do not, and that is the point. Because the score is centred on the typical station of each market, the median is close to 1.0 in every trained market and the middle 80% of stations there fall roughly between 0.55 and 1.6. The difference between markets lives in the demand base, where it can be measured: a 1.5 in Norway and a 1.5 in Germany both mean “50% above the typical station here”, and the German site is worth fewer minutes only because the German typical station is.

Across the roughly 119,000 fast-charging stations we score in 37 markets, the median in the trained markets is a little below 1.0 (0.87–0.99) because the scored population includes many stations we cannot yet observe, and those score lower on average than the observed ones the scale is centred on. In markets the model has not been trained on, there is no local typical station to centre on, so the score is measured against the typical station of the trained markets instead. There it is not centred on the local market: the median is about 1.4 in Italy and about 0.4 in Australia.

Explainability

Every score comes with a full SHAP (SHapley Additive exPlanations) breakdown showing exactly which features pushed the score up or down, and by how much. You can see that a particular location scores high because its nearest observed stations are busy and there is a supermarket within 150 metres — not just that it scores high. This matters when you’re making investment decisions: you want to know why, not just what.

Each part of the engine has its own deep-dive: the demand model, the location score, and the CPO execution score.

The location score is a demand multiplier, centred on the market. A score of 1.0 means the typical station of that market — the median of the stations we observe there. A score of 2.0 means twice the typical station’s demand; a score of 0.5 means half. The scale is continuous and has no hard upper limit.

The score is deliberately comparable within a market rather than across markets. A 1.5 in Norway and a 1.5 in Germany both mean “50% above the typical station here”. What a typical station is worth in minutes differs between countries, and that difference is carried by the demand base where it can be measured (about 108 minutes per bay per day over a year for the typical Norwegian station, 95 for the German one, 67 for the Swedish), not hidden in the score.

RatingScore rangeWhat it meansApprox. percentile
Poor< 0.6Well below the typical station of its market. Remote locations with minimal traffic, few amenities and quiet observed neighbours. Unlikely to be commercially viable without subsidies.Bottom 12%
Below Average0.6 – 0.85Below the typical station. Sparse traffic or amenities, or heavy existing competition eating into the catchment. May work for destination charging but challenging for high-utilisation DC.12 – 43%
Average0.85 – 1.15Around the typical station of the market. Serviceable: some traffic and amenities, but not a standout. Typical of suburban areas and secondary roads.43 – 75%
Good1.15 – 1.5Clearly above the typical station. Strong traffic, a good amenity mix or busy observed neighbours. The sweet spot for most new installations.75 – 91%
Very Good1.5 – 2.0Top decile. High-traffic corridors, supermarket and retail car parks with busy neighbours, and manageable competition. Premium sites that justify premium investment.91 – 98%
Excellent2.0+Twice the typical station or more. Major interchanges and urban hubs with everything in place: traffic, venue, neighbours. The highest score in the estate today is about 4.4.Top 2%

A note on market differences. Because the score is centred per market, medians are close to 1.0 in every trained market (0.87–0.99 across all scored stations there, a little below 1.0 because stations we cannot yet observe score lower on average than the observed ones the scale is centred on). Norway’s median station is not “worse” than Germany’s or France’s; each market’s typical demand is a separate, measured number in the demand base, which is exactly what you need when building a financial model. In markets the model has not been trained on, there is no local typical station to centre on, so the score is measured against the typical station of the trained markets instead. There it is not centred on the local market: the median is about 1.4 in Italy and about 0.4 in Australia.

The percentile column above is measured across the roughly 119,000 fast-charging stations we score in 37 markets, and it is re-measured after every retrain. The band edges were redrawn for v12 on 28 September 2026. Use them as a rough guide, but remember: in the trained markets the score is a demand signal relative to the local market, not a ranking of countries.

For a deeper look at how the location score is built and why it predicts CPO success, read Location score: the number that predicts CPO success.

The model ingests a wide range of openly available data. No proprietary datasets, no purchased feeds — everything is sourced from government registries, public APIs, and open data portals. Key input categories include:

  • Realtime charging data — millions of status events per day from national access points and operator feeds, telling us exactly when and where charging sessions happen
  • Road traffic volumes — annual average daily traffic counts from government transport agencies across multiple countries
  • Weather and climate — historical temperature and precipitation data, because cold weather changes EV charging patterns more than most people realise
  • EV adoption rates — battery-electric vehicle market share by country, tracking how the fleet mix evolves over time
  • Points of interest — nearby amenities, fuel stations, parking, retail POIs (malls, brand fast food, chain stores), and other relevant infrastructure from open mapping databases
  • Existing charging infrastructure — the competitive landscape of fast-chargers already in the area

All input data is open, publicly available, and legally sourced. We don't scrape, we don't buy secret datasets, and we don't rely on any single vendor's data.

Anyone can download a list of charging station locations. The hard part is having months — eventually years — of continuous, second-by-second observation of what actually happens at those stations.

We've been recording realtime charging events continuously for a long time now — every session start, every status change, every idle hour. That's a time series that cannot be recreated retroactively. You can't go back and observe what happened at a station last January if you weren't already listening.

This historical depth is what separates a model that says "this looks like a good spot" from one that says "here's how much energy a station at this spot would likely deliver in February vs. August, and here's the confidence interval." The longer we collect, the better it gets. There are no shortcuts.

Think of a charging site as two businesses stacked on top of each other. There's the asset — the physical location with its traffic, visibility, and catchment area. And there's the retail operation — the brand, pricing, uptime, customer experience, and everything else the operator brings to the table. We measure them separately, on purpose.

The location score is an asset benchmark. It measures the inherent value of a site based purely on where it is: traffic flow, nearby amenities, competitive density, EV adoption in the area. Operator identity is deliberately excluded. A great piece of real estate scores high regardless of who's running it today.

The CPO execution score is a retail benchmark. It measures how well an operator performs relative to what their locations should deliver. We take the model's predictions for every station in an operator's network, compare them to actual performance, and the gap tells you something real. An operator that consistently outperforms their location scores — better uptime, more sessions, higher utilisation — has strong brand pull, smart pricing, or good customer experience. One that underperforms has the opposite.

This separation is the point. If we mixed operator quality into the location score, a premium motorway site run by a weak operator would look mediocre, and a backstreet location run by Tesla would look brilliant. Neither is useful for site selection. You want to know what the land is worth independent of who's standing on it — and separately, whether the operator is extracting that value or leaving it on the table.

Since v9, the location score and CPO execution score are estimated jointly using an expectation-maximisation loop. The model iterates: predict location quality, compute operator residuals, update CPO factors, retrain the location model with the updated factors, and repeat until convergence. This eliminates the circular dependency that existed in earlier versions, where an operator’s brand strength could leak into their location scores and vice versa. The result is cleaner separation: a motorway site genuinely scores higher because of the motorway, not because Ionity happens to be there.

We score every operator once a month. The figure you see everywhere — the CPO benchmark, country pages, ChargiPedia, station forecasts and the business-case presets — is the average of its last three scored months in that country, so a single unusual month does not swing it.

More on how we measure operator performance in Execution score: the number that tells you which CPOs actually deliver.

The production model is v12, trained on 28 September 2026 on 97,366 clean station-months across 21,322 live stations in eight markets (Norway, Sweden, Denmark, Finland, Germany, France, Switzerland and Slovakia), covering August 2025 to August 2026. Germany, France, Switzerland and Slovakia contribute from April 2026, when their realtime data came online.

What R² means here. The target is the utilisation of one station in one month. That is an individual-level, cross-sectional quantity: two stations with identical surroundings routinely differ by a factor of two through pricing, uptime, app friction, signage and plain luck — none of which is visible in open spatial data. For targets like this an honest out-of-sample R² of 0.2–0.5 is the normal range, and a number near 0.7 is a warning sign of memorisation rather than a sign of skill. The same holds for individual incomes or house-by-house energy use: aggregate to a region or a month and the fit climbs into the 0.8s; disaggregate to the single unit and it does not.

Three numbers, three questions.

  • Demand base (country × month). How well the model tracks the level and the season of fast charging in a market. v12 reads both from a table estimated within stations, so on observed months it reproduces the typical station of each market by construction; the calendar shape it uses for forecast months reproduces the observed months within about 1%.
  • Location layer — held-out R² 0.45 (log scale, on live stations the model never trained on, averaged over three random splits). How much of the station-to-station spread within a market the 61 features explain. Per market: Denmark 0.52, Norway 0.51, Finland 0.50, Sweden 0.48, France 0.44, Germany 0.39, Switzerland 0.37, Slovakia 0.20 (135 stations). The rank correlation between predicted and actual station usage is 0.67. This is the hard, individual-level question, and the layer is judged only on stations it has not seen.
  • Calibration — median actual/model 0.98–1.00 in every market, measured on every clean month of every live station with realtime data, through the same code path that scores the product. The level is unbiased in all eight markets, and by month it stays within ±8% of 1.0 across the year.

What the numbers mean for a forecast. For a working station the typical prediction lands on what the station actually does. Half of all station-months fall between about 0.65× and 1.4× of the actual value; per market, between 54% (Switzerland, Sweden) and 69% (Denmark) of stations are within a factor of 1.5 of the model over their whole history, and 2.5–7% of stations do more than twice what the model says. Those are the figures to carry into a financial model: the level is unbiased, and for two thirds of sites the forecast lands within roughly ±40%.

Two honest caveats. A station that has gone silent, or one in its first months, runs well below the model — the model describes a working station, and the product corrects the prognosis for existing stations with their own history. And there is no growth term yet: a forecast month is last year’s same month at today’s fleet. In markets where fast charging is still growing 15–20% a year (Finland, Sweden) that is a conservative floor; a fleet-growth term is the next planned addition.

Why earlier versions looked better. v2–v10 quoted only the in-sample fit, and at 0.72–0.74 it flattered them: v10’s trees had memorised its 3,911 training stations, and re-measured on held-out stations it explained 0.22 of the full-chain variance. v11 fixed the data (clean months only) but let the trees and per-market constants compress the real differences between markets, under-predicting the Nordics by about half; it was withdrawn after two days. v12 keeps the data discipline and fixes the structure: the market level is read from a table rather than learned, and the location score is measured within each market on stations that actually work. An honest out-of-sample number from open data alone is the useful signal; an in-sample one that looks better is not.

We ship model updates regularly. Each version expands the training data, refines the architecture, or incorporates new data sources. Here's the full history:

Version What changed Overall R² Median ratio
v1 First model. Single-stage approach using spatial features and charging history. — —
v2 Introduced the two-stage architecture (demand model × location model), added weather and EV adoption as inputs. 0.74 0.98
v3 Experimental: tested decomposed competition layers. Findings folded into later versions. 0.71 1.00
v4 Experimental: evaluated four competition modelling approaches, validated confidence blending. 0.74 0.99
v5 Added operator-level calibration factors. Confidence blending for sparse areas. 0.71 0.97
v6 Migrated to unified multi-source data pipeline. Expanded training window. Broader geographic coverage. 0.64 1.00
v7 Skipped (internal numbering gap). — —
v8 Added 7 new spatial features: retail POIs (malls, brand fast food, chain stores, retail density), highway traffic percentage, max road AADT, and best TRP AADT. Expanded training to 4,083 stations / 33,934 station-months across 11 months. Feature count grew from 13 to 20. 0.69 0.99
v9 Introduced joint CPO-location estimation via EM convergence. The model and CPO execution scores are now estimated together, eliminating circular dependency where location quality was conflated with operator quality. Overall R² improved from 0.69 to 0.72. 0.72 0.99
v10 Retrain on Nordic data only (Denmark, Finland, Iceland, Norway, Sweden) with the v9 architecture: 3,911 stations / 32,722 station-months across 11 months. Every market outside the Nordics silently inherited Denmark’s demand base, and summer months needed a hand-coded correction factor. 0.73 0.98
v11 Data first: a coverage filter keeps only clean months, where a station was observed for at least 90% of the month — partly observed months had been training the model on false lows. Seasonality moved into the demand base itself as annual and semi-annual harmonics (a February cold peak and a July holiday peak), replacing the summer correction. Regularised trees. Seven trained markets (France and Switzerland join the Nordics); every other market is extrapolated with its own level constant and flagged as such. 15,645 stations / 83,422 station-months across 13 months. Held-out R² 0.25 for the location layer and 0.31 for the full chain. Retrained on 26 September 2026 after a connector-classification defect that had hidden part of the Nordic DC history was fixed. Withdrawn on 28 September 2026: on stations with a full usage history it under-predicted Nordic demand by about half and over-predicted southern Europe. v10 returned to production until v12 replaced it on 28 September 2026. 0.43 0.94
v12 Structure fixed, everything inside it re-estimated on all clean months from eight markets (Germany and Slovakia join). The demand base is a country × month table of the typical station’s usage, estimated within stations. The location score is centred per market (the median training station of each country is 1.0) and adds 33 venue features (what is within 150 metres of the bays, brand names, opening hours, parking, truck bays), station attributes (bays, charger power) and neighbour usage (how the nearest observed stations actually perform). Operator factors per country. Trained on live stations only: 4,918 stations that had gone silent or stopped reporting were removed from training. A per-site seasonal profile in Norway and Denmark, and the station’s own history blended into the prognosis of existing stations. 21,322 stations / 97,366 station-months across 13 months. Held-out station R² 0.45; median actual/model 0.98–1.00 in every market. 0.45 1.00

v12 is the current production model (28 September 2026). The R² column is not one measure: v2–v10 quote the in-sample fit (v10’s trees were memorising stations — 0.73 in-sample against 0.22 on held-out stations); v11 and v12 quote fits on stations the model never saw — see “How accurate is it?”. v11 was withdrawn after two days: its regularised trees and learned per-market constants compressed the differences between markets. v12 keeps v11’s data discipline (only fully observed station-months, only markets where we actually observe) and fixes the structure: the market level is read from a table rather than learned, and the location score is measured within each market.

v3 and v4 were internal experiments — never shipped to production, but the lessons (competition signal matters, confidence blending is essential) directly shaped v5 and v6. v7 was skipped during an internal renumbering.

We retrain whenever there's a material reason to: a new data source is integrated, a significant batch of new training months becomes available, or we've validated an architectural improvement. In practice, that's been roughly every 2–4 weeks since launch.

Every new version is validated against the previous one before going live. We keep previous models on standby for instant rollback if anything looks off. No model ships without being tested against real station performance data.

More data, more countries, more time. The model gets better every month because the underlying time series grows. A year of continuous observation is worth more than any clever algorithm, and we're building that clock every day.

On the roadmap: incorporating tariff and pricing data (we now track per-kWh prices from multiple markets), grid capacity proximity, and expanding the training set as realtime data comes online in new countries. The architecture is designed so that adding a new country's data improves predictions everywhere — not just in that country.

FC Market Outlook

An independent economic equilibrium model that projects how fast-charging infrastructure will evolve in each country. Not a trend line — a bottom-up model of how many bays the market can profitably support.

The FC Market Outlook projects how fast-charging infrastructure will evolve in each country over the next 8 years. Unlike simple trend extrapolation, it's built on an economic equilibrium model that asks: how many fast-charging bays can the market profitably support, given the number of BEVs on the road?

The core idea is that the long-term FC build rate converges toward a ratio of BEVs per FC bay where charging point operators (CPOs) can earn a healthy return on investment. In the short term, land-grab dynamics mean many CPOs are building ahead of demand — accepting losses to secure locations and market share. But over time, economics wins.

The model outputs three scenarios per country: a base case, an optimistic case (aggressive build, slower demand), and a pessimistic case (cautious build, stronger demand). Each produces year-by-year projections of FC bays, BEV fleet size, utilization, and the implied BEVs-per-bay ratio.

The equilibrium is the number of FC bays where a generic bay investment earns an acceptable return. We model a single FC bay as a discounted cash flow problem:

ParameterValueRationale
CAPEX per bay€50,000All-in cost: equipment, installation, grid connection, civil works
Operating margin60%Typical EBITDA margin translated to per-bay level (energy cost, maintenance, site lease, overheads)
Target IRR11%Hurdle rate for infrastructure assets in the EV sector
Investment horizon10 yearsTypical charger economic life before major refurbishment

From these inputs, the present value annuity factor at 11% over 10 years is 5.89. That means each bay needs to generate:

€50,000 ÷ 5.89 = €8,490/year in cash flow.

At 60% operating margin, that requires:

€8,490 ÷ 0.60 = €14,150/year in revenue.

Revenue is driven by a single metric: kWh delivered per bay per day. At a given country's FC price per kWh (excl. VAT), the required daily throughput is:

required kWh/bay/day = €14,150 ÷ (price per kWh × 365)

For Norway at €0.51/kWh (the national median), that's 76.0 kWh/bay/day. That is the economic anchor — the throughput where a bay breaks even on an IRR basis. The equilibrium bay count for any year is simply: total national FC kWh demand divided by this number.

All four parameters in the table above are fully adjustable. If you believe CAPEX is heading to €40,000 as hardware prices fall, or that a 15% IRR better reflects your cost of capital, drag the slider and the entire projection recalculates instantly. See “Can I customize the forecast parameters?” below for the full list of adjustable inputs.

Demand is built from two components:

  1. BEV stock projections — how many battery-electric vehicles are on the road each year, sourced from national EV adoption data with central/low/high scenarios
  2. FC sessions per BEV per year — how often a typical BEV uses public fast-charging. For countries with realtime data, this is measured directly from our charging event database. For countries without, we estimate from an archetype model calibrated against countries with similar characteristics

Total kWh demand = BEV stock × sessions per BEV × kWh per session. The kWh per session is fixed at the base year's observed level (approximately 43 kWh for a 40-minute session at 65 kW average delivery power in 2026). This is a deliberate choice: as battery technology improves and cars accept power faster, the total energy a driver needs doesn't change — driving patterns determine energy consumption, not charging speed.

For Norway, measured data shows 16 FC sessions per BEV per year, each averaging 40 minutes — giving approximately 555 kWh per BEV per year consumed at public fast-chargers.

We don't assume supply jumps to equilibrium instantly. Instead, the projected number of FC bays converges toward equilibrium at a rate governed by two parameters:

  • Convergence speed (α) — the fraction of the gap between current bays and equilibrium bays that is closed each year. In the base scenario, α = 0.30 (30% of the gap per year). This reflects real-world inertia: permitting, grid connections, construction timelines, and investment cycles all slow the adjustment.
  • Minimum growth floor — even in oversupplied markets, FC deployment doesn't stop. CPOs with permits in hand, grid connections secured, and brand strategies to execute will continue building. The base scenario uses a 2% annual floor.

The result is an exponential smoothing curve: if the market is undersupplied (current bays < equilibrium), build rates accelerate. If oversupplied, they decelerate — but never to zero, because land-grab momentum and strategic considerations keep the industry moving.

Both parameters are adjustable. If you think a post-AFIR regulatory push will accelerate convergence, increase α. If you expect capital markets to tighten and slow the build rate, lower the growth floor. The projection updates in real time.

Average real-world FC charging power is car-limited, not charger-limited — a 350 kW charger still delivers whatever the car's battery management system allows. Today's fleet-wide average is approximately 65 kW. As newer vehicles with faster-accepting batteries enter the fleet, we model this rising linearly to 80 kW by 2030 and continuing toward 100 kW (capped).

Critically, this affects utilization (hours occupied) but not revenue. A bay that delivers 76 kWh at 65 kW is busy for 1.2 hours. The same 76 kWh at 80 kW takes only 57 minutes. The CPO earns the same money either way — the bay is just free sooner.

This means utilization percentages will naturally decline over time even if the market is in perfect equilibrium. A falling utilization number doesn't necessarily signal trouble — it may simply reflect faster cars. The kWh throughput per bay is the better economic indicator.

ScenarioSupply sideDemand sideWhat it represents
Base Moderate convergence (α = 0.30), 2% growth floor Central BEV growth, measured demand Most likely trajectory
High build Fast convergence (α = 0.40), 5% growth floor Lower BEV growth (0.85×) Aggressive land-grab continues; CPOs overbuild, margins compress
Low build Slow convergence (α = 0.20), 1% growth floor Higher BEV growth (1.20×) Capital-constrained CPOs; BEV demand outpaces infrastructure

The scenarios are named from the supply perspective: "high build" means more aggressive infrastructure deployment, which may be good for drivers but compresses CPO margins. "Low build" means tighter infrastructure, which means higher utilization and better unit economics for existing CPOs.

We validate the economic anchor against our own realtime data. For Norway, the model predicts that a bay needs approximately 76 kWh/day (1.2 hours occupied at 65 kW) to break even at 11% IRR. Our actual data from ~12,500 RT-monitored FC bays shows a weighted annual average of 91 kWh/bay/day — about 120% of the breakeven threshold.

Seasonality is dramatic: January peaks at 138 kWh/day (cold weather, longer trips), while April troughs at 54 kWh/day — a 2.6× swing. Winter months easily clear breakeven; summer months don't. This means a Norwegian FC bay is profitable on a full-year basis only if it's large enough to accumulate winter surplus against summer shortfall.

The national average sitting 20% above breakeven might seem healthy, but distribution matters: high-traffic corridor stations can deliver 200+ kWh/day while rural bays sit well below the 76 kWh threshold. The equilibrium model predicts this gap will close as BEV fleet growth delivers more sessions per bay over time.

The model is deliberately simple, and that's a feature. But some limitations are worth understanding:

  • FC pricing is static — we use current per-kWh tariffs and don't model future price changes. In practice, pricing may compress as competition intensifies or rise if energy costs increase.
  • Uniform economics — the model uses a single CAPEX/margin/IRR assumption per bay. Real-world variation is enormous: a motorway site costs more but earns more; a rural site costs less but sees less traffic. The equilibrium represents a national average.
  • No policy modelling — subsidies, AFIR mandates, and grid tariff regulation all affect FC deployment rates. These are reflected indirectly through historical build rates but are not explicitly modelled forward.
  • Session kWh is fixed — we assume constant kWh per BEV per year at public FC. If behaviour shifts (e.g., home charging becomes more common, or road trip patterns change), demand per BEV could change.
  • Country-level only — the model projects national totals. Within a country, utilization varies enormously: a motorway junction in Sørlandet and a city-centre charger in Tromsø live in different economic realities.

Yes. The main assumptions are exposed as adjustable parameters. If you disagree with our defaults, change them — the forecast recalculates instantly to reflect your market view, not ours.

Adjustable inputs include:

  • CAPEX per bay — raise it if you’re modelling premium motorway sites with higher grid costs, lower it if you expect hardware prices to fall
  • Operating margin — adjust for your cost structure: energy procurement, site lease terms, maintenance contracts
  • Target IRR — set the hurdle rate that matches your own cost of capital or investment committee threshold
  • Asset life — shorter for conservative underwriting, longer if you plan to operate through a full technology cycle
  • FC price per kWh — the charging price you expect to sell at
  • Average delivery power — the average power delivered during a fast-charging session

Your changes recalculate the outlook charts on the page straight away. They are not saved, and the Projects business case uses our default outlook; to test your own view of a site, change its inputs in the site’s Financials step.

ChargiPedia

ChargiPedia landing page showing category cards

ChargiPedia is our industry encyclopedia. It's a structured, searchable database of every company, product, vehicle, deal, regulation, and person in the EV charging space. Think of it as the Wikipedia of EV charging, except the data is actually current.

Access is free for everyone — no account required.

The CPO directory lists every charge point operator we track. Each card shows the operator's name, logo, country, and network size. Search and filter to find specific operators, or browse by country and size.

CPO profile page showing network stats, hardware, people, and execution scores

Click any operator to open their full profile. A CPO profile includes:

  • Network size — stations, bays, and DC share across all countries of operation
  • Hardware used — which charger models are deployed, with install base numbers
  • CPMS platform — which charging point management software they use
  • Key people — executives and their roles, linked to the People directory
  • Build rate — a timeline chart showing how fast the network is growing
  • Execution scores — how well the operator performs relative to their site portfolio quality
  • Pricing — ad-hoc per-kWh tariffs where available
  • Stock chart — for publicly listed operators, share price history
  • Infrastructure by country — breakdown of the network across all markets where they operate

eMSP directory showing mobility service providers

eMSPs (eMobility Service Providers) are companies that give EV drivers access to charging networks — typically through an app, RFID card, or roaming agreement. They don't own chargers; they provide the payment and access layer.

The directory lists eMSPs with their name, country, and a brief description. Many companies operate as both CPO and eMSP, and cross-references are shown on their profiles.

The Hardware OEM directory catalogues manufacturers of EV charging equipment — from DC fast chargers to AC wallboxes. Each manufacturer profile shows their product line, country, and a description of their market position.

Individual charger model profile with specs, images, and install base

Drill into individual charger models to see detailed specs: rated power, connector types, dimensions, weight, architecture (split/integrated), IP rating, and operating temperature range. Each model page also shows its install base — which CPOs have deployed it and where — so you can see real-world adoption, not just datasheet promises.

CPMS directory listing charging management platforms

CPMS stands for Charge Point Management System — the software platform that CPOs use to manage, monitor, and monetise their charging infrastructure. Think of it as the operating system of a charging network: it handles OCPP communication, session management, billing, and usually the driver-facing app.

The directory lists platforms like has.to.be (now be.ENERGISED), Driivz, Current, Ampeco, GreenFlux, and dozens more. Each profile shows which CPOs use the platform, helping you understand market share and ecosystem relationships.

Services directory showing installers, electricians, and consultancies

The services directory lists companies that provide installation, maintenance, consulting, and other services to the EV charging industry. Categories include electrical contractors, turnkey installers, engineering consultancies, and specialist EV charging service providers.

People directory showing industry executives and their career timelines

The People directory tracks key individuals in the EV charging industry — executives, founders, and other notable figures. Each profile shows their current role, company, and a career timeline showing how they've moved through the industry. Useful for understanding who's running what, and where industry talent flows.

EV models catalogue showing vehicle cards with specs

The EV models section catalogues electric vehicles with their battery capacity, max charging speed (AC and DC), range, plug types, and architecture (400V/800V). Useful for understanding which vehicles can use which chargers and how quickly they charge — relevant context when designing charging stations and selecting equipment.

Finance and M&A transaction database with activity charts

A database of industry transactions: acquisitions, fundraising rounds, IPOs, joint ventures, and ownership changes. Each entry includes the parties involved, deal value (where disclosed), date, and a summary of what happened.

The section also includes activity charts showing deal volume and value over time, filterable by transaction type, country, and company. Useful for tracking consolidation patterns and capital flows in the industry.

Regulations database showing policies and incentive programmes

Country-specific regulations, EU directives (AFIR, RED), national incentive programmes, and standards that shape EV charging deployment. Each entry explains what the regulation requires, who it affects, and when it takes effect.

Energy directory showing energy companies active in the EV space

The Energy directory tracks energy companies that have entered the EV charging space — utilities, oil majors, renewable energy developers, and grid operators. Many of the largest CPOs are subsidiaries or divisions of energy companies, and this directory helps you understand those relationships.

Yes. Click the Suggest New Entry button on the ChargiPedia landing page, or use the edit buttons on individual profiles to propose changes. Submissions go into a review queue and are checked before publication. We welcome corrections, updates, and new entries — the more people contribute, the more complete the database becomes.

News & newsletter

News archive

News archive showing curated EV charging industry articles

A curated, searchable feed of EV charging industry news from sources worldwide. Articles are AI-tagged by topic (policy, CPO expansion, hardware, finance, consumer pricing, etc.), country, and mentioned companies. The archive grows daily.

Use the search bar to find specific topics, the sort dropdown to order by date or relevance, and the Filters button to narrow by topic, country, source, or company.

Newsletter

Newsletter configuration page with preset briefings

Your morning briefing, your way. The newsletter delivers curated EV charging intelligence to your inbox, translated to your preferred language and delivered on the schedule you choose.

Start with a preset — Nordic Intelligence, DACH Briefing, European Overview, Benelux & France, CPO Competitive Intelligence, Policy & Regulatory Watch, and more — or build a fully custom newsletter by selecting topics, countries, and companies.

Set delivery frequency (daily or weekly), preferred language, and what time you want it. The newsletter is auto-generated from our news archive with AI summarisation.

Insights

Insights page showing original analysis articles on the EV charging market

Long-form analysis and opinion pieces on the EV charging market — economics, consolidation, profitability, and what comes next. Written by our team, backed by data from the platform.

These aren't press-release rewrites. They're original analysis with a point of view. Think first-party research that says something, not content marketing that says nothing. Free to read, no account required.

Projects

The Projects tool takes a charging infrastructure project from site selection through commissioning. It's designed for CPOs, site developers, and anyone planning new charging locations. Requires the Premium subscription tier.

Project dashboard

Projects dashboard with KPI cards, project list, and filtering

Your command centre for all charging infrastructure projects. The dashboard shows KPI cards (total projects, locations, scored locations, estimated CAPEX), a filterable project list, and quick-action buttons.

Click New Project to create a project, or Plan Locations to jump straight to the planning map. Projects can be searched and filtered by phase (plan, approve, execute, live).

The project lifecycle

Every project moves through four phases:

  1. Plan — Score candidate sites on the planning map and add the best ones to the project. For each location, work through its steps: review the score, design the site, build the bill of materials (BOM) and calculate the business case (CAPEX, revenue, NPV, IRR, payback). When all three are done, mark the location as planned.
  2. Approve — Once every location is planned, send the project for approval. The plan is locked while an approver reviews it, and it either moves on to execution or comes back for revision.
  3. Execute — Manage tasks, assign contractors, track grid, permits and procurement per site, and follow the budget against the BOM through to commissioning.
  4. Live — Every location is commissioned. Generate a completion report summarising the project.

Within a project, each location has its own status: planning → planned → approved → live. The step bar at the top of a location shows which of its planning steps are done.

Location planning

Location planning map with AI search, traffic heatmap, and station density overlay

The planning map is where you evaluate potential charging locations. It overlays two key datasets:

  • FC station density (blue heatmap) — shows where existing fast-charge stations are concentrated, helping you spot gaps in coverage
  • AADT traffic volume (coloured road segments) — shows annual average daily traffic from government traffic counts, indicating demand potential

Use the AI search bar to find specific locations naturally — type something like "Burger King near Bergen" and the system finds matching locations, scoring them for charging potential.

You can also click anywhere on the map to score that location. Each scored location gets a composite score based on traffic, proximity to existing stations, nearby amenities, and other factors.

Scored locations appear in a list in the left panel. Use batch operations to select multiple locations and add them to a project in one click.

Project detail

Project detail page with map, location cards, and phase progression

Project detail locations tab showing location cards with scores and statuses

The project detail page is where you manage a specific project. It includes:

  • Project map — all locations in the project plotted on a map, colour-coded by status
  • Location cards — each location shows its name, address, score, current status, and key metrics. Click any card to drill into that location's detail
  • Phase progression — visual indicator showing the overall project phase and how many locations are in each status
  • Project KPIs — aggregate metrics: total locations, average score, estimated CAPEX, projected annual revenue
  • Name and currency — rename the project in place and choose the currency its figures are shown in. Financial defaults are set for your whole organisation in Project Settings

Project mail

Project mail inbox showing conversations with attachments

Each project has a built-in email system. Send and receive emails directly within the project context — correspondence with landlords, contractors, utilities, or team members stays attached to the project rather than scattered across personal inboxes.

Features include attachments, location tagging (link an email to a specific location within the project), and a signature editor. All project mail is visible to team members with access to the project.

Location detail — Score

Location detail overview showing score gauge and surrounding context

Location score with SHAP breakdown, traffic analysis, competition, and POI data

The score tab is the analytical core of each location. It shows:

  • Score gauge — the Pulse location score as a visual dial, with a clear rating (Poor through Excellent)
  • SHAP breakdown — a waterfall chart showing exactly which features push the score up or down, and by how much. This is the explainability layer — you see why a location scores the way it does
  • Traffic analysis — nearby road AADT values, road types, and the composite traffic score
  • Competition analysis — existing DC fast-chargers within 5, 10, and 25 km, with operator names and bay counts
  • POI analysis — nearby points of interest: fuel stations, food, retail, parking within 1 and 5 km
  • Demand forecast — monthly kWh/bay/day projections from the Pulse model, accounting for seasonality and EV adoption growth

Location detail — Site design

Site design canvas with charger placement and versioning

The site designer is a canvas where you plan the physical layout of a charging station. Place chargers from the equipment catalogue, define parking bay positions, and arrange supporting infrastructure.

The design saves as you work. It feeds into the BOM and financial model, so changing the layout automatically updates the cost estimate.

Location detail — Bill of materials

Bill of materials showing equipment, custom items, and pricing

The BOM builder lets you spec out what goes at a location. Add items from two sources:

  • ChargiPedia equipment catalogue — charger models from real hardware OEMs, with specs, market prices, and FX rate conversion. Select a model, set the quantity, and pricing populates automatically
  • Custom items — anything not in the catalogue: transformers, cables, civil works, signage, grid connection fees. Enter description, quantity, and unit cost

Apply BOM templates to quickly configure common station setups (e.g. "4-bay highway station" or "2-bay urban hub"). Templates can be saved and reused across projects.

The BOM total feeds directly into the financial model as CAPEX. Track procurement status per item: ordered, delivered, installed.

Location detail — Financial model

Financial model with CAPEX, revenue projections, NPV, IRR, and payback

Financial charts showing yearly cashflow and cumulative return

The financial model calculates a full investment case for each location:

  • CAPEX — pulled directly from the BOM total, broken down by equipment category
  • Revenue projections — based on the Pulse demand forecast for this location, multiplied by your pricing assumptions (price per kWh, energy cost per kWh)
  • NPV (Net Present Value) — discounted cash flow over the investment horizon at your chosen discount rate
  • IRR (Internal Rate of Return) — the rate at which NPV equals zero
  • Payback period — years until cumulative net cash flow turns positive

The model includes a sensitivity analysis that tests 5 parameters, each at a low and a high value around the base case: charging price (±20%), CAPEX (±20%), CPO execution score (±25%), location score (±20%) and electricity price (±30%). This gives you a range of outcomes rather than a single-point estimate.

Charts show the yearly cashflow (revenue minus costs) and cumulative return (running total of net cashflow vs. initial investment) over the projection horizon.

Location detail — Terms & comments

Location terms showing rental terms, revenue sharing, and comments

The bottom section of each location stores deal-level information:

  • Site rental terms — lease duration, rent amount, escalation clauses, and other contractual details
  • Revenue sharing — if the site owner takes a percentage of charging revenue, configure it here. It feeds into the financial model automatically
  • Comments and notes — a threaded discussion for team members to leave notes, updates, and context about the location. Timestamped and attributed to the author

Execution phase

Execution step with milestones, grid connection, permits and procurement

Once a location is approved, it enters the execution phase. This is where the plan becomes reality:

  • Tasks — create and assign tasks (e.g. "Submit grid connection application", "Order chargers", "Schedule civil works"). Track progress with status updates and due dates
  • Site build — per location: milestones, landowner agreement, grid connection, permits and the contractors assigned with their agreed price
  • Budget tracking — compare actual spend against the BOM estimate. See variances and remaining budget in real time
  • Procurement — track equipment orders: what's been ordered, delivered, and installed
  • Commissioning and go-live — a readiness checklist and test checks per installed item, then live sessions and kWh against the business case

Go-live & commissioning report

Commissioning report with completion checklist, cost summary, and timeline

When a location goes live, the system generates a commissioning report that summarises the entire journey:

  • Completion checklist — all required items verified: equipment installed, grid connected, software configured, signage in place
  • Cost summary — final CAPEX vs. original BOM estimate, with variance analysis
  • Timeline — actual milestones vs. planned dates, showing where delays occurred
  • Sign-off — digital confirmation that the location is ready for public operation

The report can be exported and shared with stakeholders, investors, or board members.

Project settings

Project settings has four tabs:

Equipment catalogue settings showing organisation equipment catalog

Equipment Catalogue — Your organisation's equipment catalog, integrated with ChargiPedia's hardware database. Add charger models from the global catalogue or create custom items. Set your negotiated prices (which may differ from market prices), manage FX rates, and organise equipment into categories.

Financial defaults settings for COGS, revenue, and other costs

Financial Defaults — Set the default financial assumptions that populate every new location's financial model. Includes cost of goods sold (energy cost per kWh), revenue assumptions (price per kWh, utilisation ramp), other costs (maintenance, site lease, insurance, back-office), and discount rate. Individual locations can override these defaults.

Contractor directory with categories and project history

Contractors — A directory of contractors your organisation works with. Categorise them (electrical, civil, general, specialist), record contact details, and track their project history. During execution, contractors from this directory are assigned to a site with their role and agreed price.

Approvals — Name the people who approve projects and the maximum CAPEX each may sign off. A project goes to every approver whose limit covers its total CAPEX; above the dual-approval threshold it needs two approvals. With no approvers set, users approve their own projects.

Forum

Forum page showing Feedback, Open Discussion, and Changelog categories

A community space for discussing EV charging infrastructure. Categories include:

  • Feedback — Bug reports and feature requests for the platform
  • Open Discussion — General EV charging industry conversation
  • Changelog — Platform updates and release notes from the Chargalytics team

Access requires an active subscription. Create threads, reply to discussions, and upload attachments.

Account & billing

Registration is a 3-step process:

  1. Credentials — Click Sign Up in the top navigation. Enter your name, email, and password.
  2. Phone verification — Enter your phone number. We send an SMS with a verification code.
  3. SMS code — Enter the 6-digit code from the SMS to confirm your phone number. Your account is now created.

Your account is created and your 7-day free trial starts immediately — full access, no payment card required.

We verify your phone number to prevent abuse and ensure one trial per person. Without this, someone could create unlimited accounts to chain free trials indefinitely.

Your phone number is used solely for account verification. It's not shared with third parties and not used for marketing. One phone number = one trial claim.

Yes. Every new account starts with a 7-day free trial of the full platform — no payment card required. You get everything: the live map, country analytics, the CPO benchmark, ChargiPedia and the Projects tool.

When the trial ends, pick a plan to keep going. If you do nothing, access simply stops and you are never charged.

For security, every login requires email-based multi-factor authentication. After entering your email and password, we send a 6-digit code to your email address. Enter it on the verification screen within 10 minutes. You can request a new code if it expires.

Tick Remember me to stay logged in for 30 days on that device.

Profile page showing name, email, bio, avatar, and organisation

Your profile page lets you update your display name, bio, LinkedIn URL, and avatar. You can also change your email (requires your current password) and change your password.

The right sidebar shows your organisation membership and lets you create a company if you haven't joined one yet.

Company management page

Create an organisation to manage team access. As an owner or admin, you can invite team members by email, assign roles (admin, member, viewer), and manage seat assignments. Company subscriptions let you share access across your team with per-seat billing.

Choose your plan on the subscription page. Two tiers are available: Analytics (€24.99 every 30 days) and Analytics + Projects (€99 every 30 days). Toggle between 30-day and annual billing — a year costs 11 times the 30-day price. All prices are shown ex sales tax / VAT — any tax that applies is calculated at checkout from your billing country.

Today's prices are early-adopter rates: subscribe now and your price stays the same until 31 December 2027, as long as your subscription stays active.

Billing dashboard showing subscription status, payment history, and referral link

The billing dashboard shows your current subscription status, plan details, next billing date, and payment history. All payments are processed securely through Stripe. You can manage your payment method, upgrade or downgrade your plan, and apply promo codes.

The Refer a Friend section lets you share a personal referral link — both you and the person who signs up get rewarded.

Cancel anytime from the billing page. Click Cancel Subscription and confirm. Your access continues until the end of the current billing period — we don't cut you off mid-cycle. If you change your mind before the period ends, you can reactivate without losing anything.

No lock-in, no penalty, no "retention specialist" phone call. Click the button, done.

Personal accounts are limited to one active session at a time. Logging in on a new device will end your session on the previous one. If you need multiple concurrent users, set up a company with a team subscription and assign individual seats.

Click Log In, then Forgot password? on the login page. Enter your email and we'll send a reset link. The link expires after a set time, so use it promptly.

Still have questions?

Drop us a line — we respond to real humans (and some very persistent bots).

Contact us