Analysis & Opinion

What actually makes a CPO profitable? Notes from the Charge Point Podcast

By Chargalytics · November 17, 2026

Watercolour of a podcast microphone on a café table, facing a retail car park at dusk with one amber-lit restaurant

A fast-charging site makes its money from three things: where it is, who runs it, and what it cost to dig into the ground. Most of the industry argues about the first, measures the second badly and flatters the third with EBITDA. That was the case our founder, Ole Henrik Hannisdahl, made to Christophe Lephilibert on episode 62 of the Charge Point Podcast, drawing on a career that runs from Norway's 2009 electric car programme through seven years as CEO of Mer Norway to building Chargalytics.

The short version: the operator matters about as much as the site, the site matters more every year because whoever owns the car park is taking the bargaining power, and the fastest way to improve a network that is already built is to get better at selling it. Below are the eight arguments worth taking into your next board meeting, each with the clip where he makes it. The whole conversation is on Spotify.

The full episode: The Charge Point Podcast, episode 62 (54 min)

Hosted by Christophe Lephilibert, published 5 Nov 2026. Listen on Spotify.

Nobody actually wants to charge

Ole Henrik's corner of the ring, as he put it, is the customer. Charging is a chore you do because the car needs it, so the job of everything else in this industry, from roaming contracts to payment standards, is to make that chore disappear. For most of the last fifteen years the industry did the opposite, and the proof he reached for is a car park in Hamburg in the summer of 2014.

He had a Tesla Model S, a girlfriend who doubted the road trip to Lake Como, and 14 charging cards collected from friends in the industry. The first charger wanted a code confirmed by phone, sat in a garage with no mobile signal and timed out after 15 seconds. The second, a Vattenfall charger in the middle of a pedestrian street, wanted a contract that could only be applied for from home, on paper, with an answer in 10 to 20 days. Every one of those chargers worked. None of them would take his money.

Watch: 14 charging cards and a car park with no signal (2½ min)

Hamburg, summer 2014. Every charger worked; none of them would take his money. The Charge Point Podcast, episode 62, from 21:23.

He thinks the industry is now repeating the mistake with Plug&Charge: a good idea that will work, wrapped in a certification setup closer to a national ID scheme than to the fraud risk of a 30-minute top-up. The goal is simple: plug in and walk away. We looked at where it actually works in Europe in our Plug&Charge deep dive, and the honest answer is that nobody can tell you.

Why does charging get better as it gets bigger?

Norway is, in Ole Henrik's word, done. Electric cars are about 95% of new sales, so the question has moved from whether people will buy them to what happens once everyone has one. Even at 100% of sales it takes around 18 years for the cars on the road to turn over, which puts Norway somewhere in the middle of that ramp. For a charging company the number that matters is not the electric share of the fleet but how many electric cars there are per square kilometre. A dense continental market can pay its way at around 2% of the fleet; sparse Norway needs several times that to reach the same density.

The good news from the middle of the ramp is that the system improves with scale, and not in a straight line. Queues are a statistics problem, and the Erlang C model, built for telephone exchanges more than a century ago, shows that one bigger hub absorbs random arrivals far better than several small sites. More cars and bigger sites mean shorter queues for drivers and higher utilization for the operator at the same time. We ran the model on 8 966 European DC sites in The third plug is worth more than the twelfth.

Watch: why charging gets better as it gets bigger (1½ min)

Includes the second lesson from Norway: it is just a car. His mother drives one. The Charge Point Podcast, episode 62, from 12:27.

The tricky D in EBITDA

Christophe quoted one of our earliest deep dives back at him: can EBITDA be a misleading metric for a CPO? Ole Henrik didn't take the escape hatch. For an asset-heavy fast-charging operator it is a misleading metric. A reasonably run operator should reach an EBITDA margin of 60% to close to 70%, which tells you the sites cover their running costs and not much else.

The money is in the D. Building a network means digging money into the ground and waiting seven, ten, twelve or fifteen years for each site to pay it back. In theory you can move the hardware. In practice at least half of the capex (groundworks, cabling, the grid connection) stays sunk at that site, and nobody moves anything anyway. So EBIT is where the game is, and site selection decides most of it. What does it take for a CPO to be profitable? has the arithmetic.

Watch: EBIT is where the game is (2 min)

Ends with why we built Chargalytics: "we were doing it blind". The Charge Point Podcast, episode 62, from 28:03.

You're buying time, not water

Around 2015 the plan at Grønn Kontakt, as Mer was then called, ran in three phases. Small batteries would charge close to home. Medium batteries would bring queues to the motorways. Big batteries, above 70 to 80 kWh, would turn fast charging into a corridor business while everyday charging moved to homes and cabins. So the money went into shopping centres near where people live, and some of it into corridors.

That forecast had to be thrown away. When the big batteries arrived, the cars were still sitting at the shopping centre next to the driver's home. Fast charging turned out to be a convenience product, priced like bottled water: you pay for having it here and now, not for the electricity. It is also why fast charging is only about 5–7% of the energy an EV driver uses. That's our number. There are plenty of others, and Ole Henrik invites anyone who disagrees to say so.

Watch: the cars that stayed at the shopping centre (1½ min)

The forecast we had to throw away. Corridors came good later, once there were enough cars to fill them on a Wednesday. The Charge Point Podcast, episode 62, from 33:05.

Same site, twice the money

Our location model has three layers: how much charging a market will bear, how good the location is, and who runs it. The third surprised us most. Because we score the location and the operator separately, we can compare operators on equally good sites, and the gap is wide: fuel retailers and Tesla can earn about twice as much from the same location as asset-focused operators.

The ranking follows the distinction Ole Henrik set out early in the episode. Asset people (utilities, infrastructure funds, car makers) see a charger as a machine that produces cash flow. Retail people (fuel retailers, supermarkets, fast-food chains) see customers who produce revenue. Fuel retailers and Tesla sit at the top of our execution ranking; networks owned by utilities and car makers sit lower. Execution score: the number that tells you which CPOs actually deliver explains the method.

Watch: same site, twice the money (2 min)

Yes, he names names. One of them is his old employer. The Charge Point Podcast, episode 62, from 37:53.

Your marketing budget is an investment

The good news for asset-heavy operators is in the same data. What is in the ground is a done deal; how you sell it isn't. A better retail strategy works on every site at once, including the ones built in the wrong place, which makes it the fastest lever a finished network has.

It is not a tweak, though. It means telling a board that marketing is an investment, not an expense. In a utility's spreadsheet, a business with 10 million in revenue, 1 million in profit and 1 million in marketing doubles its profit by cutting the marketing, because nothing in the model links marketing to revenue. A retailer's model has that link and knows roughly what each euro brings back. That mindset can be learned, but someone has to start the conversation in the boardroom.

Watch: your marketing budget is an investment (1 min)

The boardroom conversation every asset-owned CPO has to have sooner or later. The Charge Point Podcast, episode 62, from 39:52.

Who owns the car park?

Ole Henrik's map of the industry is a four-box model. One axis asks whether you own or control the property; the other asks whether you need charging itself to make money or use it to feed another business. Fuel retailers own their forecourts and charge for profit. Supermarkets and fast-food chains own their car parks and charge for footfall and loyalty. Utilities need the profit but rent the space. Tesla, Ionity and other car-maker networks sit in the hardest box: in it for the cars, on someone else's land.

His prediction is that the whole chart moves towards the property owners. Good sites are filling up, landlords now know what a charging bay is worth, and every CPO that rents its sites will have to renegotiate its entire network over the next 10 to 15 years, from a slightly weaker position each time. Operators drift towards being efficient white-label services for whoever owns the ground, and some landlords will want the business for themselves: he fully expects to see a McDonald's charging arm within the next ten years. The Consolidation Game maps the likely winners.

Watch: why the property owners win (2 min)

The McDonald's line arrives at the end. The Charge Point Podcast, episode 62, from 44:09.

What happens to the chargers nobody uses?

Christophe's last question was whether some stations will simply be abandoned. They already are, at least in Norway. Once a charger is in the ground it stays as long as it makes an operating profit, and in Norway you have to be quite bad not to. The real test comes when the hardware or the lease runs out. Then the site is a new business case, the money already spent is irrelevant, and if the numbers don't work it goes.

Much of what was built early for geographic coverage is going exactly that way. It is why Ole Henrik argued, earlier in the episode, that public money should mostly stay out of compliance networks. It is an odd message from someone who used to run a CPO, and he put it plainly: please don't subsidize us.

Watch: the reinvestment decision (1 min)

Christophe asks the question; the answer starts in Norway. The Charge Point Podcast, episode 62, from 50:33.

The bottom line

Asked what he would do on day one as CEO of a large European CPO, Ole Henrik gave two answers that sum up the episode. First, make sure every new euro goes to a location you can win and pay back, and if the going rate for the good sites is too high, wait for someone else to overpay or look further east. Second, fix the retail strategy, because it is the one lever that lifts the whole network, including the sites you would never build again.

Location, execution, capital. For most networks, two of the three were decided the day the concrete set. The one still open is the one most boards treat as a cost.

Which leaves a question our data can't answer. If retail know-how is worth up to twice the revenue on the same site, why do so few asset-owned networks buy it, hire it or partner for it? If you have sat in one of those boardrooms, we would like to hear what stopped them.

Thanks to Christophe Lephilibert and the Charge Point Podcast for having us. Listen to the full episode on Spotify.