EVCharge Live Indonesia · Tangerang · 11–12 November 2026
The full agenda — with receipts
All 65 sessions across 5 stages. Speakers link to their ChargiPedia profiles; the context notes are ours, built from our own market data and news archive.
All times are Tangerang local time, WIB (UTC+7).
09:00Keynote
Keynotes
ORGANISER'S WELCOME
Chargalytics context
Housekeeping, but also the framing for the event: this is a solar and storage conference, with EV charging as one track. Charging professionals should listen for how much of the agenda is generation and grid supply, since that is where charging economics get decided. Nothing beyond the title is known, so there is no claim to test here.
PC
Paul Clark
Managing Director, Asia · Terrapinn
09:20Keynote
Keynotes
KEYNOTE: Planning for 100 GW: National Priorities to Deliver Indonesia's Solar Energy Transition
Chargalytics context
A 100 GW solar ambition set by the national planning ministry is the upstream signal for charging. Cheap, abundant daytime power only helps EV operators if grid access, interconnection and tariffs follow. Ask which priorities are funded, how the plan treats grid and storage build-out, and whether transport electrification appears as a demand-side target or is left out.
TP
Togu Pardede
Director of Energy, Mineral and Mining Resources · Ministry of National Development Planning (Bappenas)
09:40Keynote
Keynotes
KEYNOTE: Establishing a Safe Electric Vehicle Ecosystem
Chargalytics context
The transport ministry is the regulator whose rules will shape charger certification, installation standards and battery safety. For CPOs and hardware vendors, the question is whether 'safe ecosystem' means enforceable standards and testing requirements, or guidance. Watch for timelines, who bears compliance cost, and how rules will treat the large electric two-wheeler base alongside cars.
KEYNOTE: Powering the Energy Transition: Semiconductor Innovations for Solar, Energy Storage and EV Charging
Chargalytics context
Power semiconductors (SiC, GaN) sit under the cost and efficiency curve of chargers, inverters and storage converters. This is a vendor keynote, so expect a technology-push view. The useful test is whether the efficiency and power-density gains it describes translate into lower cost per kW for DC charging and solar-plus-storage sites, not just better datasheets.
KEYNOTE PANEL: Electrifying 80,000 Villages Across the Archipelago: Can Distributed Solar Deliver at Scale?
Chargalytics context
The panel pairs the ministry, the presidential office, a development bank, an independent think tank and a developer, so it should show how rural electrification gets financed and where it stalls. Villages are not an EV charging market, but the same questions of capex, O&M in remote locations and offtake risk apply to any off-grid charging idea. IEEFA's presence suggests a hard look at delivery versus targets.
MY
Mutya Yustika
Moderator; Research & Engagement Lead, Indonesia Energy Transition · Institute for Energy Economics and Financial Analysis (IEEFA)
PRESENTATION: Powering Indonesia's Green Horizon: From Remote Island Microgrids to Smart C&I Energy Storage Solutions
Chargalytics context
An inverter manufacturer's pitch, covering island microgrids and commercial and industrial storage. For charging professionals, C&I storage is the practical route to peak-shaving and to running chargers where grid capacity is weak. Judge it on real project data: round-trip efficiency, cycle life, and whether the economics hold without subsidy.
TECHNICAL WORKSHOP: Greening the Giant: Practical Decarbonization & Hybrid Solar Integration in Utility Scale IPP Operations
Chargalytics context
A utility-scale IPP operator on hybrid solar integration shows how incumbents are decarbonising. It matters to charging because hybridising thermal plants with solar sets the future grid mix that EVs charge from. Look for operating data on curtailment, dispatch and cost, not just intentions.
PRESENTATION: Beyond Charging Stations: Building a Sustainable and Scalable EV Hub Ecosystem in Indonesia
Chargalytics context
The title says 'hub ecosystem', which implies moving beyond kWh sales to bundled revenue from services, retail, fleets or energy. The question for operators is whether any of it makes utilisation-driven economics work in a market with low EV density. Ask for site-level numbers: utilisation, revenue mix, payback and grid connection cost.
PRESENTATION: Utility-Scale Solar: From Pilot to Large-Scale Deployment
Chargalytics context
BloombergNEF is the most data-driven voice on the day's solar track, so this is likely the best source for costs and deployment benchmarks. For charging, the relevant parts are the pace of capacity additions, levelised cost trends and what bottlenecks (grid, land, finance) are named. Those same bottlenecks tend to constrain charging rollout too.
PANEL: How Commercial Real Estate Is Deploying Solar: Malls, Hotels, Hospitals and Mixed-Use Assets
Chargalytics context
Malls, hotels and hospitals are the main hosts for urban charging sites, so their solar economics and landlord appetite for onsite energy assets matter directly. Rooftop solar adoption there is a leading indicator for solar-plus-charging offers. Ask about lease structures, who owns the asset, and whether EV charging is an add-on or part of the business case.
AR
Aulia Ramadhan
Moderator; Investment Support Lead · World Resources Institute (WRI) Indonesia
ML
Muhammad Faisal Ain Lubis
Lead of Sustainable Energy Transition in Indonesia (SETI) · Institute for Essential Services Reform (IESR)
PRESENTATION: Scaling Community-Level Solar Projects Across Remote Indonesia
Chargalytics context
A philanthropic alliance explaining how community solar scales in remote areas should be heavy on delivery models and financing. The lessons on maintenance, local operators and tariffs carry over to any rural or island charging attempt. Look for evidence on what actually keeps systems running after commissioning.
RF
Rizky Fauzianto
Indonesia Country Director · The Global Energy Alliance for People and Planet
PANEL: Are we ready for EV scale by 2030? Aligning policy, utilities and private capital
Chargalytics context
This is the session most directly about the charging business: it brings together automakers, electric motorcycle makers, an investor and a regional EV media voice. The answer turns on utility grid readiness, tariff design, incentives and whether private capital sees returns in low-utilisation networks. Listen for specifics on two-wheeler charging and battery swapping versus plug-in, since that is where Indonesia's volume is likely to come from.
RJ
Ruth Ruth Dea Juwita
Moderator; Journalist · The Jakarta Post
PANEL: What Will It Take to Scale Utility-Scale Solar in Indonesia
Chargalytics context
Utility-scale solar sets the grid-carbon and power-price baseline that every EV charger in Indonesia depends on, so the pace of this build-out decides whether charging counts as clean mobility or just shifts load onto coal. The session should address what is actually blocking scale: offtake terms, land, grid interconnection, financing cost, or carbon revenue. Charging network operators and CPOs should listen for signals on green power availability and PPA structures.
Rizki Wildan
Moderator; Manager, Renewable Energy and Thermal · AFRY
PRESENTATION: Full-Life-Cycle O&M for ASEAN PV & Storage Assets: From Practical Implementation to Value Improvement
Chargalytics context
Asset performance after commissioning is where PV and storage returns are made or lost, and the same logic applies to charging sites that pair with solar and batteries. The talk should show what full-life-cycle O&M looks like in ASEAN conditions and how it turns into measurable value such as uptime, degradation control and cost per kWh. Operators of solar-plus-storage charging hubs should look for lessons they can borrow.
PANEL: From Partnerships to Projects: Structuring Utility-Scale Solar for Deployment in Indonesia
Chargalytics context
Partnership announcements are cheap; bankable structures are the bottleneck. With PLN as the dominant offtaker alongside development finance voices, this panel should show how risk allocation, financing and delivery actually work at scale. Anyone planning charging infrastructure that depends on PLN supply or co-investment should note which structures PLN will really sign.
Scaling Renewable Energy Projects in Indonesia: Structuring, Financing and Delivering Projects at Scale
PRESENTATION: Building Indonesia's EV workforce – installers, technicians and digital specialists
Chargalytics context
Charger rollout is limited as much by qualified installers, technicians and software specialists as by capital, and uptime depends on them after installation. This is a government view on how the workforce gap will be closed, so the key questions are about certification standards, training capacity and timelines. CPOs, installers and OEMs should care because it affects both hiring costs and service quality.
PRESENTATION: Solar Ambitions: What Actually Unlocks Investment in Utility Scale Projects?
Chargalytics context
The title asks the right question: Indonesia has ambitious solar targets, but investment follows risk-adjusted returns, not ambition. A state infrastructure financier is well placed to say which conditions, such as tariff certainty, offtaker credit or regulatory clarity, move capital. The answer carries over directly to anyone trying to finance charging assets in the same market.
DD
Delano Dalo
Head of Public Financing 2 Division · PT Sarana Multi Infrastruktur (SMI)
13:20Stage 1
C&I Solar
PANEL: Powering Industrial Operations with Solar and Storage: From Cost Pressure to Energy Strategy
Chargalytics context
Industrial buyers adopting solar and storage to cut energy costs are building the same skills, contracts and on-site grid infrastructure that fleet electrification will need. The session should clarify the economics behind the shift and how firms move from a cost-saving project to a real energy strategy. Fleet and depot charging planners should watch for how these firms handle load, storage and financing.
AP
Aloysius Damar Pranadi
Moderator; Senior Manager of Energy Transition · PwC
AM
Arianto Mulyadi
Director - Corporate Communication & Sustainability · Indesso
PRESENTATION: Building Indonesia's Clean Energy Workforce: Talent, Skills and the Human Capital Challenge
Chargalytics context
Talent is a hard constraint on every clean energy build-out, charging included, and it is rarely priced into project plans. The talk should quantify the skills gap and say which roles are scarcest and how fast supply can grow. Employers and CPOs planning to expand should ask whether the pipeline can support their rollout targets.
SC
Sean Chen
Director and Co-Founder · WeNetwork Asia
PANEL: Hybrid Solar–Diesel Systems for Remote Operations: Mining, Islands and Industrial Sites
Chargalytics context
Remote mines, islands and industrial sites are where diesel is most expensive and electrified equipment or charging is hardest to supply, making hybrid systems a test bed for off-grid power economics. The panel should address fuel savings, battery sizing, reliability and how these sites can support electric vehicles or mining fleets. Operators looking at charging beyond Java should listen closely.
PANEL: Why Isn't EV Charging Scaling Faster? Uncomfortable Realities and Practical Solutions
Chargalytics context
This is the core session for Chargalytics readers: the title promises uncomfortable realities, so expect honest answers on utilization, site economics, grid connection delays, payment interoperability and reliability. The mix of operator, software and safety voices should reveal where the real bottleneck sits, whether in supply, demand or operations. Anyone with a charging business plan in Indonesia should compare their assumptions against what this panel says.
RJ
Ruth Ruth Dea Juwita
Moderator; Journalist · The Jakarta Post
PRESENTATION: Rural Electrification Challenges and Opportunities in Indonesia: Unlocking Sustainable Energy Access and Partnership Opportunities with PLN Group
Chargalytics context
Rural electrification sets the limits on where EVs and chargers can operate outside urban centers, and PLN Group's partnership offer shows where it expects private capital. The session should lay out access gaps, funding models and what a partner would actually do. Charging developers should consider whether electrification programs open future grid-connected sites, or whether they compete for the same capital and attention.
PANEL: What Comes Next for Energy Producers in the Energy Transition? (The Role of Oil & Gas and Coal Mining in Decarbonization)
Chargalytics context
Oil, gas and coal companies hold the capital, land and grid-scale experience, and some are already moving into fuel retail and charging, so their transition strategy shapes the competitive landscape. The panel should address what they will actually invest in, on what timeline, and whether decarbonization is a core strategy or a side project. CPOs should assess whether these incumbents are future partners, competitors or both.
AD
Ahmad Zuhdi D.K
Moderator; Principal · Energy Shift Institute
TECHNICAL WORKSHOP (1HR): WIRE. CONFIGURE. POWER UP. A Practical Residential ESS Workshop for Installers & EPCs with DEYE
Chargalytics context
A hands-on residential ESS session for installers and EPCs, valuable because home storage and home charging increasingly share the same installer base, panel capacity and inverter configuration issues. Expect practical wiring and setup content from a single vendor, so treat it as product-specific training rather than a neutral comparison. The useful question is how storage configuration interacts with EV charging load at home.
PRESENTATION: Alternative Business Models for Grid Financing in Indonesia
Chargalytics context
Grid capacity is the hidden constraint on charging rollout in Indonesia, and the state utility's balance sheet alone can't fund the upgrades. The session should show which financing structures could pay for grid expansion and whether they can carry charging-driven load growth. Worth attending for anyone who needs grid connections, because capital for the grid decides where and how fast charging can be built.
Trucks are a small share of vehicles but a large share of transport emissions and diesel demand, and they set the charging requirements: high power, depot-first, long dwell-time planning. Key questions: what total cost of ownership case exists today, which policies are needed to close the gap, and what charging infrastructure fleets will require. Relevant for CPOs weighing depot and corridor investment against passenger-car networks.
PRESENTATION: Rapid Deployment Solar + Storage for Diesel Replacement in C&I and Remote Operations
Chargalytics context
Diesel replacement through solar plus storage is the same engineering problem as off-grid or weak-grid charging: firm power at a site where the grid is absent or unreliable. The session should clarify the economics versus diesel and how quickly these systems can be deployed. Relevant for charge point developers who face connection delays or remote and industrial sites.
PRESENTATION: 2-Wheeler charging and battery swapping – Indonesia's mass EV opportunity
Chargalytics context
Two-wheelers dominate Indonesia's vehicle fleet, so this segment, not cars, will decide whether the country reaches EV volume. The central question is whether home charging, public charging or battery swapping fits it best, and what that means for standards and unit economics. Anyone sizing the Indonesian market should check whether their car-centric charging model applies at all.
FA
Faris Adnan
Head of Transport and Sustainable Mobility Technology · Institute for Essential Services Reform (IESR)
PRESENTATION: Renewable Energy and Decarbonization Implementation in Industrial Park
Chargalytics context
Industrial parks aggregate demand, land and a single operator, making them one of the more bankable settings for on-site renewables and, by extension, for fleet charging. Look for how the park is procuring clean power and whether EV charging is part of the plan. Relevant for CPOs seeking anchor-load sites with a controlled power supply.
SI
Sanny Iskandar
Director · KIIC Industrial Estate
PRESENTATION: Electrification Is an Organizational Transformation: Lessons from Electrifying One of Indonesia's Largest Mining Operations
Chargalytics context
Mining is a heavy-duty electrification use case where the hardware is rarely the main obstacle; operations, training and procurement are. This session should show what changes in an organization when a large site converts, and what that implies for charging uptime, energy supply and contracts. Valuable for charging and energy providers selling into industrial fleets.
PRESENTATION: Standardisation and interoperability – why Indonesia must avoid a fragmented charging market
Chargalytics context
Connector, protocol and payment fragmentation is cheap to prevent early and expensive to fix once networks are built. The session should state which standards Indonesia should lock in, and what happens to utilization and roaming if it doesn't. Relevant for hardware makers, CPOs and regulators making equipment choices now.
PANEL: Future of C&I Solar: What Will Drive the Next Wave of Adoption
Chargalytics context
Commercial and industrial solar is where cheap generation meets large daytime loads, and it is also where depot charging and on-site generation will increasingly be combined. The panel should address what is limiting adoption (financing, regulation, grid-export rules, offtaker credit) and which of those could be solved. Useful for charging operators exploring bundled solar-plus-charging offers.
CD
Christoforus Deberland
Moderator; Division Head of Rolling Stock & AFC Maintenance · Mass Rapid Transit (MRT) Jakarta
PE
Puti Cresti Ekacitta
Renewable Energy Consultant · ion Ventures
PRESENTATION: Solar, BESS & Optimal hybrid solution for remote sites
Chargalytics context
A hybrid solar, battery and backup design for remote sites is also the basic blueprint for charging where the grid is weak. The session should show how sizing is optimized and what the cost per kWh is against diesel. Relevant for anyone planning charging outside Java's dense grid.
PANEL: What Will Enable Faster Deployment of Rural Electrification in Indonesia
Chargalytics context
Rural electrification and EV charging compete for the same scarce resources in underserved areas: grid extension, capital and local operating capacity. The panel should identify the real bottlenecks, whether funding, permitting, supply chain or community buy-in. Of interest to developers who expect charging demand to follow energy access outside the main cities.
DT
Dominikus T.
Moderator; Energy Analyst · Petromindo
PANEL: From pilot to scale – buses, logistics and ride-hailing electrification
Chargalytics context
Fleet electrification in buses, logistics and ride-hailing is where predictable, high-utilization charging load is created. This panel brings operators and a city transport agency together, so it should give a view of why pilots stall: vehicle cost, financing, charging access or route economics. CPOs should listen for which fleets will own their charging and which will buy it as a service.
DW
Dedi Wiyanto
Moderator; Senior Researcher · Institute for Transportation Studies (INSTRAN)
SM
Sunarko, ATD, MT,
Head of the Department of Transportation · Pekanbaru City Transportation Agency (Dinas Perhubungan Kota Pekanbaru)
TECHNICAL WORKSHOP (1HR): Beyond Megawatts: Building Energy Projects with Communities. Community-first energy development and shared value — from Canada to Indonesia
Chargalytics context
Community acceptance is a real project risk for energy infrastructure, and charging hubs and grid upgrades face it too. The workshop should provide practical methods for benefit-sharing and early engagement, drawn from Canada and adapted to Indonesia. Useful for project developers who want fewer permitting and local-opposition delays.
THTim Hopkins
President · ADVANTAGE PROFESSIONAL SERVICES LTD
15:40Stage 1
C&I Solar
PANEL: No Upfront Cost, Lower Energy Bills - So Why Isn't C&I Solar Scaling Faster?
Chargalytics context
PPA and lease models take capex off the customer's books, so the bottleneck is elsewhere: offtaker credit, contract tenor, grid-interconnection rules, or trust in developers. For charging operators, C&I rooftops and car parks are the most likely sites for solar-plus-charger pairings, so whatever slows solar there will slow behind-the-meter charging economics too. The session should name which barrier matters most and whether any of them is regulatory rather than commercial.
WK
Widyaka Jack Kartanegara
Moderator; Board Member of Energy Work Group (Chief Technical Advisor at Prima Energi Consult) · ASEAN Federation of Engineers Organization
NS
Nurhuda Sulistiyanto
Director · PT Mahawira Digdaya Aman
15:40Stage 2
Rural Electrification
PRESENTATION: Bankable on Paper, Stuck in Reality: Breaking the Financing Bottlenecks. Pathway to Execution.
Chargalytics context
A project that is bankable on paper but can't close financing is the same problem charging networks hit when scaling past pilots: lenders price uncertain utilisation and unproven counterparties. The useful content here is what lenders actually require, such as offtake structure, credit enhancement or standardised documentation. Anyone raising capital for distributed energy or charging assets in Indonesia should compare that checklist with their own.
PANEL: Diesel vs B50 vs EV: What Actually Works for Heavy Transport and Logistics in Indonesia?
Chargalytics context
Heavy transport is where the economics of fuel, biodiesel mandates and electrification collide, and where charging demand would be largest per site. The panel mixes a battery-swap operator, a truck OEM, a logistics platform and a ferry operator, so it should compare total cost of ownership, duty cycles, and charging versus swapping on real Indonesian routes. The key question is whether B50 delays the commercial case for electric trucks or just covers the gap until it arrives.
PRESENTATION: Can Solar Unlock Higher Value for Indonesia's Fisheries?
Chargalytics context
This is an off-grid, productive-use case: fisheries rely on cold chain and diesel, so the question is whether solar can cut costs and raise product quality and price at the same time. It matters to charging professionals as a test of whether remote, load-specific energy systems can be financed, and they may later carry electric boats or vehicles. Look for evidence on cost per kWh against diesel and on who pays for the equipment.
HH
Helmi Hermain
Renewable Energy Lead · IPNLF
09:20Stage 1
Keynotes
ORGANISER'S WELCOME
Chargalytics context
A scene-setting opening with no content to assess beyond the title. Use it to get a sense of the event's emphasis, and which segments (utility-scale, C&I, storage, mobility) get the most attention, since that indicates where Indonesian solar and storage deal flow is concentrated.
PC
Paul Clark
Managing Director, Asia · Terrapinn
09:30Stage 1
Keynotes
KEYNOTE PROJECT SHOWCASE & PANEL "Indonesia's Priority Solar Projects: From Pipeline to Delivery"
Chargalytics context
PLN's renewable arms and the land bank agency are in one room, which is where project delivery is decided: land, grid connection and offtake timing. The key questions are which priority PLTS projects have reached construction and what is holding up the rest. Charging developers should watch grid capacity and the pace of cleaner supply, because both determine whether EV load is actually low-carbon.
Bringing together stakeholder leaders behind Indonesia's priority PLTS projects to showcase what is being developed, where projects stand today, and share perspectives on what could help accelerate project delivery and support Indonesia's wider renewable energy ambitions. (Brief project showcases from participating stakeholders, followed by a moderated joint discussion)
De-dieselization pairs solar and storage with the same power electronics and microgrid controls that remote charging depends on. The panel includes developers, a state investment vehicle and a community foundation, so it should address who funds island and remote systems and how they are kept running after commissioning. For charging professionals, the key question is whether electrified mobility can be a bankable anchor load for these microgrids or only an afterthought.
Practical strategies for leveraging solar, energy storage and electrification infrastructure to support state-led diesel replacement (de-dieselization) initiatives, while enabling reliable power and cleaner mobility across remote communities, industrial and island operations
ML
Muh. Asnoer Laagu
Moderator; Director of Technology and Innovation · Pelita Khatulistiwa Foundation
TECHNICAL WORKSHOP (1HR): Solar Mounting Systems, Real-World Installation Challenges and Solutions
Chargalytics context
Mounting is an unglamorous source of cost, delay and warranty disputes, and the same issues come up with canopy and carport structures for solar-covered charging. An installer-led workshop should cover roof types, wind and corrosion loads, and what failures look like in the field. It is worth attending if you build or specify sites, and less so if you only buy energy.
PRESENTATION: Powering Indonesia's Data Centre Boom: Can Solar & Storage Keep Up with AI-Driven Demand
Chargalytics context
Data centres are competing with EV charging for the same scarce grid capacity, and both need firm, high-density power. The real question is whether solar and storage can supply a meaningful share of a 24/7 load given land, interconnection and tariff constraints, or whether they mainly serve as a sustainability add-on. Charging developers should look at how large loads secure connections and what that implies for their own grid-access queue.
BS
Bima Septiantoro
Data Center Facility Specialist · Cushman & Wakefield
PRESENTATION: Rooftop Solar for Urban Households: Adoption Trends and Challenges
Chargalytics context
Urban household solar is the residential counterpart to home charging: both depend on net-metering rules, upfront cost and installer trust. The session should show what adoption is actually happening and where it stalls, whether in tariff policy, financing or roof access. For charging professionals, it is a useful indicator of how willing households will be to invest in home energy hardware.
PRESENTATION: Designing Indonesia's end-of-life battery system before volumes surge
Chargalytics context
Battery volumes from EVs and stationary storage will reach end of life later but predictably, and the time to set up collection, second-life and recycling rules is before the flow arrives. A PLN speaker suggests a utility perspective, so the session should cover who owns responsibility for spent batteries, how second-life use gets certified, and whether storage can absorb retired EV packs. Charging and swapping operators who handle large pack inventories should pay attention to the liability this creates.
PRESENTATION: AI in Solar Design and Optimising Design Workflows
Chargalytics context
Design software is where developers can cut pre-construction time and cost, which matters when pipelines are large and margins thin. The useful content is measured: how much time is saved, what accuracy is retained, and where engineers still override the tool. The same workflows are relevant to charging developers planning solar-integrated sites.
PRESENTATION: Powering Off Grid and Underserved Areas: Can Solar and Storage Bridge Indonesia's Energy Gap?
Chargalytics context
Off-grid and underserved communities are where solar-plus-storage economics beat diesel, yet they are also where financing, O&M and local capacity usually fail. For EV charging professionals, this is the early test of whether distributed power can later support charging outside Java's grid. The key questions: what delivered cost per kWh, what uptime, and who keeps the systems running after commissioning?
ML
Muh. Asnoer Laagu
Director of Technology and Innovation · Pelita Khatulistiwa Foundation
PANEL: Scaling EV ecosystems – What Indonesia Can Learn from Taiwan, Singapore, and Malaysia
Chargalytics context
Taiwan, Singapore and Malaysia took different routes to EV adoption (manufacturing and scooters, tight city-state planning, incentive-led rollout), so the comparison is useful to anyone sizing Indonesia's charger market. Look for evidence on what actually drove utilization: charger density, tariff design, incentives, or fleet electrification. Logistics and e-commerce fleet operators on the panel make this relevant for anyone building depot and two-wheeler charging.
PRESENTATION: Making Solar Dispatchable: Integrating Storage into Utility-Scale Projects in Indonesia
Chargalytics context
Pairing storage with utility-scale solar converts an intermittent asset into a firm one, and that sets how much clean power Indonesia's grid can absorb, including for charging load. The session should show real project design choices: storage sizing, offtake structure with PLN, and the cost premium over plain PV. Developers and grid planners should care most.
PRESENTATION: 50 GW Local Manufacturing Push: How Indonesia Will Build a Solar Supply Chain for National Deployment
Chargalytics context
A 50 GW local manufacturing target is a major industrial policy bet, and the gap between current module capacity and that goal is the real story. Domestic content rules will affect solar and storage costs, and with them the price of the clean electricity behind EV charging. The questions: where do cells and wafers come from, what is the cost versus imports, and how fast can capacity be built?
PRESENTATION: Grid Constraints and the Role of Storage in Supporting Renewable Integration
Chargalytics context
PLN's view of grid constraints is the most direct signal of how much renewable capacity and new load, including fast charging, the system can accept and where. Storage is both a fix and a competitor for interconnection capacity. Watch for specifics: which regions are constrained, what storage procurement is planned, and how EV load figures into planning.
TECHNICAL WORKSHOP (1HR): Last-Mile Reality: Designing and Planning Solar + BESS Deployment to Indonesia's Remote and 3T Regions
Chargalytics context
Remote and 3T (frontier, outermost, disadvantaged) regions are where logistics, not module price, drives project cost and failure rates. A one-hour technical session should offer practical design rules: load profiling, battery sizing, transport and maintenance planning. Useful for anyone considering charging or microgrid projects beyond the main grid.
PANEL: PV+BESS for Industrial Power Stability: Solving Reliability Challenges
Chargalytics context
Industrial sites are the most bankable early market for PV+BESS because outages and tariff exposure have a measurable cost, and the same sites are natural candidates for fleet charging. The panel mixes finance, advisory, industry and equipment voices, so expect the debate on payback, financing structures and reliability guarantees. Key question: does the storage case stand without subsidy?
AH
Ali Hanif
Moderator; Committee Board for the Research and Technology Division · The Indonesian Solar Energy Association (AESI)
HS
Hans Sutikno
Indonesia Lead · Climate Bonds Initiative
CG
Camilo Gaona
Country Manager · PT ERM Indonesia
PRESENTATION: Eco-Friendly EV Charging Infrastructure Powered by Multi-Fuel Converted Generators
Chargalytics context
Using multi-fuel converted generators to power chargers is a pragmatic answer to weak grid access, but its emissions and cost claims need scrutiny. Compare against grid-connected and solar-plus-storage charging on cost per kWh, lifecycle emissions and fuel supply. Because it comes from PLN, it also hints at how the utility plans to extend charging into constrained locations.
ROUNDTABLE by CastleAsia: From Pipeline to Financial Close: Who Must Carry the Risk in Indonesia's Solar Expansion?
Chargalytics context
Indonesia's solar pipeline is large on paper, but financial close is where projects stall, and the real issue is who absorbs offtake, currency, land and curtailment risk. The answer shapes cost of capital for all clean infrastructure, charging included. Developers, lenders and PLN should care about how risk is allocated, not just announced targets.
ROUNDTABLE 1-A
IB
Ian Betts
Moderator; Research and Development Advisor · CastleAsia
PANEL: EVs as Energy Assets: Connecting the Battery Value Chain, Circularity, Renewable Energy and the Grid
Chargalytics context
Treating EVs as grid and materials assets, through V2G, second-life batteries and recycling, only matters if the economics and regulation exist, and in Indonesia the nickel value chain adds a distinct angle. The questions: is there a viable business case for second-life or managed charging, and what policy gaps block it? Relevant for charge point operators, utilities and battery makers.
DF
Dimas N Fadhil
Moderator; Urban Mobility Manager · World Resources Institute (WRI) Indonesia
PRESENTATION: Reliable Energy for Resilient Primary Health Care: Opportunities for Solar and Storage in Indonesia's Last-Mile Health Services
Chargalytics context
Clinics without reliable power lose vaccine cold chains and basic services, which makes health facilities a clear, measurable use case for solar plus storage in last-mile areas. The lessons on sizing, funding and maintenance carry over to any distributed energy project in remote regions. Look for data on outage rates and the cost per facility.
NN
Nahla Jovial Nisa
Co-Founder · Pelita Khatulistiwa Foundation
SHOWCASE: From Innovation to Impact - ERI@N-ECOI Clean Energy Innovation Showcase
Chargalytics context
A fast showcase of early-stage clean energy firms from Singapore's research ecosystem, spanning sensing, power systems, renewables and hydrogen. Treat it as a scouting opportunity: which technologies are past pilot, and which have a plausible link to charging, storage or grid management? Ask each for deployment evidence, not roadmaps.
SL
Stener Lie
Host; Senior Research Fellow · ERI@N-ECOI (Energy Research Institute @ NTU - Energy Centre of Innovation)
14:20Stage 1
Energy Storage & Batteries
PANEL: More Installed Projects Than License Cap: Is Indonesia's Installation Capacity Holding Back Growth?
Chargalytics context
The title points to a mismatch: installers are building more projects than the license cap allows, so the question is whether the bottleneck is regulatory quotas or actual installer capacity. For EV charging, rooftop solar and charging sites compete for the same grid-connection approvals and electrical contractors, so whatever limits solar will likely limit charger rollout. Listen for how the cap is set, how much capacity is stuck in the queue, and whether PLN, the regulator and installers agree on the cause.
AS
Antonius Ivan Sudibyo
Moderator; Head of Research · Evident Institute
Joni Joni
EVP of Retail Sales and Customer Service · PT PLN (Persero)
PRESENTATION: Preparing the grid for bidirectional charging and distributed storage
Chargalytics context
Bidirectional charging only creates value if distribution networks can accept export, meter it and pay for it, and that is a utility problem before it is a vehicle problem. With a PLN speaker, the session should show how the utility plans for V2G and distributed storage: interconnection rules, tariff signals, and any pilot plans. Charge point operators and OEMs should look for concrete technical requirements and timelines, since vague intent won't justify building bidirectional hardware.
PRESENTATION: The Real Cost of Fleet Electrification: Why TCO Models Fail in the Real World
Chargalytics context
Fleet buyers often rely on TCO models that assume ideal utilization, stable electricity prices and no downtime, and the gap between model and operations is where electrification projects stall. The session should show which assumptions break first in practice: charging infrastructure and grid connection costs, energy tariffs, vehicle idle time, residual values, or financing terms. Fleet operators and charging providers should take away the inputs worth stress-testing before signing a contract.
PANEL: Energy Storage Economics in Indonesia: What Must Change to Bring Costs Down and Reach Scale?
Chargalytics context
Storage is the lever that could cut demand charges and grid-upgrade costs for fast-charging sites, but its economics depend on local battery pricing, import duties, financing and insurability. The panel mixes a developer, a contractor-integrator and an insurance broker, so it should address who bears performance and fire risk and how that shows up in cost of capital. Look for specific cost drivers and policy changes rather than general calls for scale, and for whether any of it reaches behind-the-meter charging projects.
MA
Mhd. Taufik Arifin
Moderator; CEO · PT. Liberty and General Insurance Broker
ROUNDTABLE by CastleAsia: From Targets to System Readiness: How Should Indonesia Sequence Solar, Storage, Grid and EV Investment?
Chargalytics context
Indonesia has ambitious renewable and EV targets, but the order in which solar, storage, grid and charging are built decides whether each one is usable or stranded. The roundtable should address sequencing: does grid reinforcement come before charger rollout, and does storage precede additional solar? Charging investors should care because siting, utilization and power costs all depend on those upstream choices, so listen for specific priorities and trade-offs rather than a restated target list.