CharIN Testival ASIA · Ansan-si · 12–15 October 2026
CharIN Testival ASIA
Every session with context, every exhibitor linked to its ChargiPedia profile, and a route plan for whatever your job title says.
14 sessions 13 speakers 2 exhibitors
On stage right now
Full agenda
The agenda, annotated
We read the whole programme so you don't have to
All 14 sessions, each with our own note on why it matters, who it's for, and what to read first.
One session, as it appears
Day 1 ·09:40 ·Main
Contactless GbE Inside Existing EV Charging Connectors
Chargalytics context
High-speed data (Gigabit Ethernet) inside the connector is the enabler for ISO 15118-20, Plug & Charge, and future V2G telemetry — but retrofitting it without touching existing pins is a hard mechanical and EMI problem. Anyone running large CCS/NACS fleets should ask whether this is backward-compatible with deployed hardware or requires new connector tooling.
Software & Interoperability
Procurement & Hardware
3 further reads
- Context on every session. Not the blurb the organiser wrote — our read on what's actually at stake.
- Filter by who it's for. Rollout, procurement, commercial, exec, advisory or technical.
- Further reading. The stories behind each session, from our own archive and the news wire.
- Every speaker, linked. Straight through to their ChargiPedia profile and their company's.
Right now at Ansan-si
Nobody on the meet-up map yet — be the first pin.
Don't walk Ansan-si at random
Six ready-made routes — sessions worth sitting in, booths worth the detour, in an order your feet will thank you for.
Software & Interoperability
Trace the interoperability story from theory to megawatt-scale reality, then get hands-on in the test bays.
Policy & Regulation
Follow the regulatory and standards thread from global plans down to Australian grid-code implications.
Board Members & Investors
A market-and-money day: regional demand, OEM strategy, and the flex-value pitch, capped with the networking event.
Procurement & Hardware
From test-system rigor to megawatt hardware realities, then three days to watch the gear get stress-tested.
Where
Programme data compiled from the official CharIN Testival ASIA agenda; sessions move, rooms change. Verify against the official agenda.